BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 18, 2024 at 8:00 PM

Updated September 19, 2024

Site work for a playground / park / athletic field in Whiteman Air Force Base, Missouri. Completed plans call for site work for a playground / park / athletic field.

As of September 18, 2024 subbids have been filled. ___________________________________________________________ Amendment 4 - The purpose of this amednment is to schedule a Site Visit on Tuesday August 20th, 2024 at 2:00 pm CDT. If you require base access please contact FSS Director at 660-687-5493 and ensure to bring two valid forms of ID (Drive License, Passport, etc.). Amendment 2 - The purpose of this amendment is to schedule a Site Visit on Thursday August 15th, 2024 at 09:00 am. If you require bases access please contact FSS Director at 660-687-5493 and ensure to bring two valid forms of ID (Driver License, Passport, etc). Project Title: Pickleball Court Project Location: Whiteman AFB, MO 65305 FA462524R1001, Pickleball Court at Whiteman AFB, MO. Resurface existing activity court under Alpha Warrior rig pavilion and convert it into a practice pickleball court at Whiteman AFB, MO, 65305. This project includes general crack-filling repairs and patching, application of a colored acrylic surfacing, and pickleball court conversion. INFORMATION REGARDING SITEVISIT/QUESTIONS/SUBMISSION OF PROPOSALS: Site Visit is available upon request from the offeror. Questions will be submitted to francisco.martinez_martinez.1@us.af. miland ross.kerley@us.af.mil no later than 14 August 2024 at 2:00 p.m. CDT and answers will be posted towww.sam.gov. PROJECT BACKGROUND: Resurface existing activity court under Alpha Warrior rig pavilion and convert it into a practice pickleball court at Whiteman AFB, MO, 65305. This project includes general crack-filling repairs and patching, application of a colored acrylic surfacing, and pickleball court conversion. B. CONSTRUCTION SCOPE: The contractor shall execute the project as shown in this SOW. The contractor shall supply all labor, materials, transportation, equipment, and supervision to provide a complete, finished, functional product. B. Pre-Construction Site Survey: The contractor, prior to the start of any on site construction activities, shall conduct a condition survey with the construction inspector, after which the contractor shall note the condition of trees, shrubs, grassed areas, concrete, and any structural damage that may exist immediately within or adjacent to work site.

Award

Playgrounds / Parks / Athletic Fields

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
178
Active Projects
115
Bidding Soon
1,167
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 23, 2024

September 23, 2024

Project location map

To Be Determined, Whiteman Air Force Base, MO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.