BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 28, 2024 at 8:00 PM

Updated September 29, 2024

Site work for a water / sewer project in Center Township, Indiana. Completed plans call for site work for a water / sewer project.

Site Directions: Project has 2 locations, along Touby Pike and CR 300 N and along US-35 and Nickel Plate Trail. The Work of this Contract is generally described as general construction of watermain, appurtenances, traffic control, erosion control, paving, and other site restoration. Major work areas include: 1. New 20-inch watermain, approximately 7,260 feet, 12-inch watermain, approximately 40 feet, and 6-inch watermain, approximately 60 feet, along Touby Pike and CR 300 N. 2. New 16-inch watermain, approximately 100 feet, 14-inch watermain, approximately 830 feet, 12-inch watermain, approximately 2,700 feet, and 6-inch watermain, approximately 60 feet, along US-35 and Nickel Plate Trail. Questions regarding the bid documents should be directed to Donohue & Associates attention: Jeremy Roschyk. PE (Telephone 574-213-6124, emailjroschyk@donohue-associates.com). Pre-Qualification: Yes. Question Deadline 08/28/2024 Questions received less than seven days prior to the date for opening for Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect

Bid Results

Water / Sewer

$4,210,560.00

Public - City

Site Work

75

27

2

6

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
207
Active Projects
123
Bidding Soon
1,331
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 4, 2024

October 4, 2024

Project location map

Nickel Plate Trail & US-35, Center Township, IN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.