Published December 18, 2025 at 7:00 PM
Updated December 19, 2025
Renovation of a medical facility in Los Angeles, California. Completed plans call for the renovation of a medical facility.
This project will replace the obsolete emergency power system at 200 Medical Plaza (MP200), also known as the Peter Morton Medical Building. The project will include the removal, decommissioning, and replacement of two existing 1000 kW emergency diesel generators along with their associated controls. The existing load banks will also be removed and replaced with new resistive load banks sized to match the new generator capacity. To support the new equipment, the existing day fuel tank will be decommissioned and replaced, and the diesel exhaust treatment system will be upgraded to comply with current South Coast Air Quality Management District (SCAQMD) requirements. In addition, seven Automatic Transfer Switches (ATS), the paralleling switchgear, and all associated conductors currently distributed throughout the building will be removed and replaced in their entirety. A new equipment platform will be constructed to support the generators, while temporary cabling routed into the B-level central plant and roof-level electrical room will be properly weatherproofed and fireproofed. The scope also includes modifications to the existing roof structure to accommodate new loads. This will require removal and replacement of the roof membrane, insulation, substrate, drains, and waterproofing in all areas affected by the work. An expansion of the existing roof opening will be carried out, including the installation of new structural framing to support a new roof hatch and ladder. Structural strengthening will be incorporated as required, along with new roof curbs for the equipment. Finally, the project will address the restoration of interior components impacted by construction, such as fire sprinkler systems, HVAC components, ceiling finishes, wall and ceiling repairs, and painting. Ancillary components necessary for a complete, fully operational, and code-compliant system including new breakers for the paralleling switchgear, will also be replaced as part of the work. The abatement of Hazardous Materials is required. MP 200 will be fully occupied by UCLA at all times during construction. CM/Contractor shall demolish and legally dispose of the existing generators off University property. Generators will not be salvaged back to the University. The installation of the equipment will be bid in Bid Packages. In addition, seven Automatic Transfer Switches (ATS), the paralleling switchgear, and all associated conductors currently distributed throughout the building will be removed and replaced in their entirety. A new equipment platform will be constructed to support the generators, while temporary cabling routed into the B-level central plant and roof-level electrical room will be properly weatherproofed and fireproofed. The successful Bidder will be required to have the following California current and active contractor's license at the time of submission of the Bid: B License (General Building) The work described in the contract is a public work subject to section 1771 of the California Labor Code. The successful Bidder shall pay all persons providing construction services and/or any labor on site, including any University location, no less than the UC Fair Wage (defined as $15 per hour) and shall comply with all applicable federal, state and local working condition requirements. University has prequalified CM/Contractor Bidders for this Project and posted a list of said firms on the website. The Anticipated Contract Value is $14,889,264 Requests for clarification or interpretation of the Bidding Documents must be in writing and received by University by 4:00 p.m., December 30, 2025.
Sub-Bidding
Medical
$14,889,264.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 13, 2026
March 16, 2026
200 UCLA Medical Plaza, Los Angeles, CA
Related To This Project
Los Angeles, CA
Bid Date: Sep 11 2024
Los Angeles, CA
Bid Date: Nov 17 2025
Los Angeles, CA
--
Los Angeles, CA
--
Los Angeles, CA
Bid Date: Oct 01 2024
Los Angeles, CA
Bid Date: Aug 21 2024
Los Angeles, CA
Bid Date: Aug 21 2024
Los Angeles, CA
Bid Date: Aug 20 2024
Los Angeles, CA
--
Los Angeles, CA
Bid Date: Sep 05 2024
Los Angeles, CA
Bid Date: Aug 20 2024
Los Angeles, CA
Bid Date: Sep 12 2024
Los Angeles, CA
Bid Date: Aug 19 2024
Los Angeles, CA
Bid Date: Aug 22 2024
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.