Published December 18, 2025 at 7:00 PM

Updated December 19, 2025

Renovation of a medical facility in Los Angeles, California. Completed plans call for the renovation of a medical facility.

This project will replace the obsolete emergency power system at 200 Medical Plaza (MP200), also known as the Peter Morton Medical Building. The project will include the removal, decommissioning, and replacement of two existing 1000 kW emergency diesel generators along with their associated controls. The existing load banks will also be removed and replaced with new resistive load banks sized to match the new generator capacity. To support the new equipment, the existing day fuel tank will be decommissioned and replaced, and the diesel exhaust treatment system will be upgraded to comply with current South Coast Air Quality Management District (SCAQMD) requirements. In addition, seven Automatic Transfer Switches (ATS), the paralleling switchgear, and all associated conductors currently distributed throughout the building will be removed and replaced in their entirety. A new equipment platform will be constructed to support the generators, while temporary cabling routed into the B-level central plant and roof-level electrical room will be properly weatherproofed and fireproofed. The scope also includes modifications to the existing roof structure to accommodate new loads. This will require removal and replacement of the roof membrane, insulation, substrate, drains, and waterproofing in all areas affected by the work. An expansion of the existing roof opening will be carried out, including the installation of new structural framing to support a new roof hatch and ladder. Structural strengthening will be incorporated as required, along with new roof curbs for the equipment. Finally, the project will address the restoration of interior components impacted by construction, such as fire sprinkler systems, HVAC components, ceiling finishes, wall and ceiling repairs, and painting. Ancillary components necessary for a complete, fully operational, and code-compliant system including new breakers for the paralleling switchgear, will also be replaced as part of the work. The abatement of Hazardous Materials is required. MP 200 will be fully occupied by UCLA at all times during construction. CM/Contractor shall demolish and legally dispose of the existing generators off University property. Generators will not be salvaged back to the University. The installation of the equipment will be bid in Bid Packages. In addition, seven Automatic Transfer Switches (ATS), the paralleling switchgear, and all associated conductors currently distributed throughout the building will be removed and replaced in their entirety. A new equipment platform will be constructed to support the generators, while temporary cabling routed into the B-level central plant and roof-level electrical room will be properly weatherproofed and fireproofed. The successful Bidder will be required to have the following California current and active contractor's license at the time of submission of the Bid: B License (General Building) The work described in the contract is a public work subject to section 1771 of the California Labor Code. The successful Bidder shall pay all persons providing construction services and/or any labor on site, including any University location, no less than the UC Fair Wage (defined as $15 per hour) and shall comply with all applicable federal, state and local working condition requirements. University has prequalified CM/Contractor Bidders for this Project and posted a list of said firms on the website. The Anticipated Contract Value is $14,889,264 Requests for clarification or interpretation of the Bidding Documents must be in writing and received by University by 4:00 p.m., December 30, 2025.

Sub-Bidding

Medical

$14,889,264.00

Public - State/Provincial

Renovation

91

26

3

6

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
606
Active Projects
262
Bidding Soon
3,373
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 13, 2026

March 16, 2026

Project location map

200 UCLA Medical Plaza, Los Angeles, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.