BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an office development in Johnson, Vermont. Conceptual plans call for the renovation of a office development.

In the Fall of 2023, the Vermont Studio Center reached out to LCPC to inquire about using the Wolf Kahn Lodge studio as a floodplain mitigation and educational area. In winter of 2024, LCPC, VSC, and state partners from the Vermont Department of Environmental Conservation, met to evaluate this site for a potential flood mitigation project. This project is located in the center of Johnson Village along the Gihon River, on a 0.5-acre parcel near the Pearl Street Bridge. In Spring of 2024, LCPC applied for funding through the Lamoille Basin Clean Water Service Provider to pursue preliminary design engineering for this site. The grant gave LCPC the means to manage and provide project coordination support. This scoping study will include a flood analysis and alternatives analysis to explore different options for the site. There is a fair amount of fill due to the site being the former site of the Town Garage. This preliminary design work will help plan for a potential floodplain restoration project. These efforts will improve the area to reestablish a natural stream channel to enhance flood water capacity and improve water quality. Design plans must consider the existing uses of adjacent parcels and the possibility of an educational pollinator garden. Contact Information: Alberto Della Torre Phone: (802) 851-6348 Fax: Email: alberto@lcpcvt.org All questions should be sent to Alberto Della Torre (alberto@lcpcvt.org) by August 16th, 2024 SCOPE OF WORK The LCPC is assisting the Vermont Studio Center in retaining the services of a qualified consulting team with experience in environmental and/or civil engineering to complete the scope of work outlined below. All materials and documents, whether preliminary or final, provided in the Scope of Work shall become the property of the Vermont Studio Center. $30,055 is available to complete the Scope of Work. The method of Contractor Selection has not been Determined at this time.

Conceptual

Office

$30,055.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
190
Active Projects
60
Bidding Soon
1,431
All Active Projects
579
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 29, 2025

img_map_placeholder

80 Pearl St, Johnson, VT

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.