BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 13, 2024 at 8:00 PM

Updated August 14, 2024

This is a service / maintenance or supply contract in Palmyra, New Jersey. Contact the soliciting agency for additional information.

The work to be performed under this Contract includes the furnishing of labor, tools, equipment, temporary support structures and materials for Maintenance of Bridges, Equipment and Other Facilities The work to be performed under the Contract includes performing emergency and conventional maintenance on the bridges, equipment (excluding vehicles and small portable equipment) and other facilities owned and/or operated by the Burlington County Bridge Commission. Typical items of work for which quantities are indicated and/or estimated include removing, repairing, furnishing, fabricating and erecting structural steel members and components. The one (1) year Contract shall commence on or about October 1, 2024, and conclude on September 30, 2025. Security must be accompanied by a certified check, cashier's check or bid bond drawn to the order of the Burlington County Bridge Commission for 10% of the bid, not to exceed $20,000. The Commissioners reserve the right to accept or reject all bids and waive any immaterial defects or informality in any bids or in the bidding in accordance with applicable law.

Sub-Bidding

Bridges / Tunnels

Public - County

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
872
Active Projects
394
Bidding Soon
5,965
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 4, 2024

October 1, 2024

Project location map

Multiple Locations, Palmyra, NJ


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.