Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a civil project in Green Bay, Wisconsin. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and water / sewer project.
The work, in general, will include the approximate quantities and items listed below: Clearing and Grubbing - 0.10 acres Sawcut 300 If Excavation-450 Remove Culverts - 650 If Culvert Storm Sewer, 15"-36" HDPE-700 if Culvert Storm Sewer, 53'W x 41"H, CMP Pipe - Arch - 55 If Asphalt Pavement Pulverizing, 6-21,500 sy Crushed Aggregate Base Roadway - 2,160 cy Crushed Aggregate Base Shoulder and Driveways - 1,825 cy Hot Mix Asphalt Pavement, 3.5" - 21,500 sy Hot Mix Asphalt Pavement, Driveways 450 sy Riprap, Medium - 300 sy Traffic Control - 1 Is Pavement Markings, 4" Yellow - 17,000 If Topsoil, Turf, Grasses, and Erosion Mat - 29,235 sy Each proposal shall be accompanied by a certified check payable to the owner equal to five percent (5%) of the proposal or a bid bond of a bonding company duly authorized to do business in the State of Wisconsin in an amount equal to five percent (5%) of the proposal. This proposal guarantee shall be subject to forfeiture as provided by law. When submitting an electronic bid, Bidder is required to deliver the original certified check or bid bond within 72 hours of bid opening to Cedar Corporation. This project is part of a Local Road Improvement Program (LRIP) TRIS Program which consists of road improvements for an existing road, including clearing and grubbing, pulverize existing asphalt and base, excavation, storm sewer culverts, crushed aggregate base, hot mix asphalt pavement, and restoration. Proposals shall not be withdrawn for a period of 90 days after the date of opening. The Town of Eaton reserves the right to reject any or all of the proposals and to waive any informalities therein. Est. Completion Date: Aug. 30, 2025 Question Deadline 08/22/2024
Award
Roads / Highways
$954,048.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 27, 2024
September 30, 2024
Niles Road, Green Bay, WI
Related To This Project
Green Bay, WI
Bid Date: Sep 06 2024
Green Bay, WI
Bid Date: Aug 27 2024
Green Bay, WI
Bid Date: Aug 19 2024
Green Bay, WI
Bid Date: Aug 30 2024
Green Bay, WI
Bid Date: Aug 30 2024
Green Bay, WI
--
Green Bay, WI
Bid Date: Sep 03 2024
Green Bay, WI
Bid Date: Jun 23 2021
Green Bay, WI
Bid Date: Sep 12 2024
Green Bay, WI
--
Green Bay, WI
Bid Date: Aug 22 2024
Green Bay, WI
Bid Date: Sep 01 2024
Green Bay, WI
Bid Date: Sep 16 2024
Green Bay, WI
--
Green Bay, WI
Bid Date: Jul 25 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.