BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Green Bay, Wisconsin. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and water / sewer project.

The work, in general, will include the approximate quantities and items listed below: Clearing and Grubbing - 0.10 acres Sawcut 300 If Excavation-450 Remove Culverts - 650 If Culvert Storm Sewer, 15"-36" HDPE-700 if Culvert Storm Sewer, 53'W x 41"H, CMP Pipe - Arch - 55 If Asphalt Pavement Pulverizing, 6-21,500 sy Crushed Aggregate Base Roadway - 2,160 cy Crushed Aggregate Base Shoulder and Driveways - 1,825 cy Hot Mix Asphalt Pavement, 3.5" - 21,500 sy Hot Mix Asphalt Pavement, Driveways 450 sy Riprap, Medium - 300 sy Traffic Control - 1 Is Pavement Markings, 4" Yellow - 17,000 If Topsoil, Turf, Grasses, and Erosion Mat - 29,235 sy Each proposal shall be accompanied by a certified check payable to the owner equal to five percent (5%) of the proposal or a bid bond of a bonding company duly authorized to do business in the State of Wisconsin in an amount equal to five percent (5%) of the proposal. This proposal guarantee shall be subject to forfeiture as provided by law. When submitting an electronic bid, Bidder is required to deliver the original certified check or bid bond within 72 hours of bid opening to Cedar Corporation. This project is part of a Local Road Improvement Program (LRIP) TRIS Program which consists of road improvements for an existing road, including clearing and grubbing, pulverize existing asphalt and base, excavation, storm sewer culverts, crushed aggregate base, hot mix asphalt pavement, and restoration. Proposals shall not be withdrawn for a period of 90 days after the date of opening. The Town of Eaton reserves the right to reject any or all of the proposals and to waive any informalities therein. Est. Completion Date: Aug. 30, 2025 Question Deadline 08/22/2024

Award

Roads / Highways

$954,048.00

Public - City

Paving, Site Work

57

14

2

8

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
27
Active Projects
14
Bidding Soon
263
All Active Projects
108
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 27, 2024

September 30, 2024

img_map_placeholder

Niles Road, Green Bay, WI

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.