Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 26, 2024 at 8:00 PM
Updated August 27, 2024
Renovation of a water / sewer project in Fort Worth, Texas. Conceptual plans call for the renovation of a water / sewer project.
South Mary's Creek & Walnut Creek Lift Stations Questions Due Date: Sep 9th 2024, 5:00 PM CDT Online Portal The Fort Worth Water Department (FWWD) requests proposals for the design of two lift stations (Mary's Creek Confluence Lift Station and the Walnut Creek Lift Station) in west Fort Worth that will pump to the proposed Mary's Creek Water Reclamation Facility (MCWRF). SCOPE OF WORK The work by the Engineer would start with coordination with the MCWRF and Mary's Creek Lift Station Force Main projects to determine the size and hydraulic requirements of the two lift stations to match the capacity of MCWRF. Upon acquisition of the lift station site, the Water Department will direct the Engineer to initiate the detailed design of each lift station, force main connection, and any required gravity mains connections. Work will include, permitting, preparation of plans and specifications, bidding assistance, and construction services (excluding on-site inspection). The individual components of each project are described in more detail below: o Wastewater Lift Station: The wastewater lift station will be designed to operate under both normal and peak flow conditions. Design of the lift station shall include coordination with the power company to bring power to the site, design of controls and SCADA interface, odor control, permitting, and development of operating methodology in conjunction with city staff. Initial size and future expansions with the coordinated with the MCWRF Engineer to match the plant capacity. o Wastewater Force Main: Connections to Force Mains. Surge model, force main pressure class, and air valve analysis. Coordinate with Force Main Engineer on final force main size, pressure class, and air valve placement. o Gravity Sewer Main. The sewer gravity main connection and provisions for bypass will be required between the lift station(s) and existing gravity lines. COORDINATION The Engineer will be required to coordinate with numerous stakeholders as part of this project. Coordination with the Tarrant Regional Water District, the US Army Corps of Engineers, and Tarrant County, will all be required as part of the lift station design. SCHEDULE The initial goal will be to quickly negotiate and award the engineering agreement in the December 2024. Easement acquisition for the gravity lines, permitting, and preparation of plans and specifications should be accomplished within 14 months. The total budget for engineering the two lift stations is $3,500,000.00 A Business Equity Goal for this project is 8%. Consultants shall submit their Business Equity utilization plan with their proposal. Failure to submit the Business Equity plan with the proposal will render the proposal non-responsive. The Business Equity plan will be part of the weighted selection criteria. The method of Contractor Selection has not been Determined at this time.
Conceptual
Water / Sewer
$3,500,000.00
Public - City
Renovation
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 13, 2024
Multiple Locations, Fort Worth, TX
Related To This Project
Fort Worth, TX
--
Fort Worth, TX
--
Fort Worth, TX
--
Fort Worth, TX
--
Fort Worth, TX
--
Fort Worth, TX
Bid Date: Sep 23 2024
Fort Worth, TX
Bid Date: Feb 09 2021
Fort Worth, TX
--
Fort Worth, TX
--
Fort Worth, TX
Bid Date: Sep 05 2024
Fort Worth, TX
--
Fort Worth, TX
Bid Date: Aug 29 2024
Fort Worth, TX
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
