BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 11, 2025 at 8:00 PM

Updated March 12, 2025

Demolition, site work and new construction of a mixed-use development in Sugar Land, Texas. Completed plans call for the demolition of a educational facility; for the construction of a 468,354-square-foot educational facility; for site work for a educational facility; and water / sewer project.

As of March 11, 2025, this project is under construction. Completion expected August 2028. Request for sub-contractor proposals for FBISD Clements High School Rebuild (Demolition, Earthwork, Site Utilities, Building & Site Concrete) "Durotech, Inc., as Construction Manager at Risk, on behalf of Fort Bend I.S.D, will receive sub-contractor/vendor proposals for the Clements High School Rebuild project, as designed by DLR Group for the following scopes of work - Demolition, Earthwork, Site Utilities, Building & Site Concrete. This GMP pricing is for Demolition/Earthwork/Site Utilities/Site & Building Concrete based on 100% CD. The project consists of the construction of a new building (468,354 SF) which will serve as the New Clements High School. The new facility will house the following: Academic/Administration, Fine Arts/Theater, Cafeteria/Kitchen, Central Plant, Athletics. The existing Clements HS building will be demolished after the new building is constructed. Project Start Date: 10-1-2024. Project End Date: Phase 1 - 5-31-2027; Phase 2 - 8-31-2028. Prevailing wage rates in conformance with State of Texas law will be paid on this project. All proposals shall remain valid for sixty (60) days. The Owner, Architect/Engineer and Construction Manager reserves the right to reject any and all proposals, to waive any informalities and irregularities in the proposal process, and to make the awards in the best interest of the owner. By submitting a proposal, each proposer agrees to waive any claim it has or may have against the Owner, the Architect/Engineer, Construction Manager and their respective employees arising out of or in connection with the administration, evaluation, or recommendation of any proposal; waiver of any requirements under the Proposal Documents, or the Contract Documents; acceptance or rejection of any proposals; and award of a Contract."

Under Construction

Educational

$222,854,405.00

Public - County

Demolition, New Construction, Site Work

969

38

459

2

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
353
Active Projects
193
Bidding Soon
3,330
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 11, 2024

December 6, 2024

Project location map

4200 Elkins Rd, Sugar Land, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.