EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 20, 2024 at 7:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Aberdeen, New Jersey. Completed plans call for site work for a water / sewer project.

The Work Includes the Furnishing of All Labor, Material and Equipment Necessary or Required to Complete All Work Set Forth in These Specifications and Shown on the Plans. The Estimated Item Quantities Are Summarized as Follows: Approximate Estimated Item Quantities 1. Mobilization Ls 2. Clearing Site Ls 3. Test Pits 2 Un 4. 14" Pvc Force Main - Open Cut 50 Lf 5. 16" Hdpe Force Main - Directionally Drilled 980 Lf 6. Force Main Bypass Pumping to Include All Pipe, Valves, Fittings, and Chamber Complete 1 Un 7. Interconnection Chamber to Include All Pipe, Valves, Line Stops With Bypass, Fittings and Vault, Complete 1 Un 8. Fittings, 14" Bend 2 Un 9. 14" Dip Cap 1 Un 10. 16" Hdpe to 14" Pvc Connection Coupling 2 Un 11. Trench Stabilization, Soil Aggregate I-8, Size #57 50 Lf 12. Dense Graded Aggregate, 6" Thick 10 Sy 13. Bids Must Be Made on the Standard Proposal Form in the Manner Designated Therein and Must Be Enclosed in a Sealed Envelope Bearing the Name and Address of the Bidder and the Name of the Project on the Outside, Addressed to the Old Bridge Municipal Utilities Authority, and Must Be Accompanied by Certified Check, Bid Bond or Cashier's Check Drawn to the Order of the Old Bridge Municipal Utilities Authority for Ten Percent (10%) of the Total Amount Bid, Provided Said Security Need Not Be More Than $20,000.00. All Bid Guarantees Shall Be Accompanied by an Executed Consent From an Approved Surety Company, Licensed to Conduct Business in the State of New Jersey, Agreeing to Furnish the Required Performance and Maintenance Bond Upon the Award of Contract. The Signed Proposal Forms and Bid Security Must Be Delivered to the Place and on or Before the Hour Named Above. The Accepted Bidder Must Sign the Contract Within Ten (10) Days After the Notice of Award or Forfeit His Bid Security. Bid Securities Will Be Returned to All but the Three Apparent Lowest Responsible Bidders. All Other Bid Securities Will Be Returned Within Three Days After Awarding and Signing of the Contract and Approval of the Contractor's Performance Bond, Saturdays, Sundays, and Holidays Excepted. This Contract is Subject to the Provisions of the New Jersey Local Public Contracts Law, N.j.s.a. 40a:11-1, Et Seq. Bidders Are Required to Comply With the Requirements of N.j.s.a. 10:5-31 Et Seq. And N.j.a.c. 17:27 (Affirmative Action Law); P.l. 2004, C.57 (Business Registration Act); and P.l. 2003, C.91 (Public Works Contractor Registration Act). Sealed Bids for This Project Are Being Solicited Through a Fair and Open Process in Accordance With N.j.s.a. 19:44a-20.5 Et Seq. The Right is Reserved to Reject Any or All Proposals, in Whole or in Part, or to Make Awards to Such Bidder or Bidders Who, in the Judgment of the Old Bridge Municipal Utilities Authority is the Lowest Responsible Bidder and to Waive Such Informalities as May Be Permitted by Law. R FILE NO. M-0010-0360-000 (S2953)

Award

Water / Sewer

$1,058,801.00

Public - City

Site Work

11

20

10

5

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Substitution Procedures, Administrative Requirements, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Control, Testing Laboratory Services, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Precast Concrete, Precast Structural Concrete, Grouting
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Cold-Formed Metal Framing, Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Vapor Retarders, Roof and Wall Specialties and Accessories, Roof Specialties, Reglets
Division 08 - Openings

Division 08 - Openings

Hardware
Division 10 - Specialties

Division 10 - Specialties

Storage Specialties, Postal Specialties, Mail Boxes
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Rugs and Mats, Runners
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Pumps, Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Distribution
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Finish Grading, Excavation and Fill, Subgrade Preparation, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles, Foundation Anchors, Tunneling and Mining
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Pruning, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Unit Paving, Curbs and Gutters, Planting, Plants, Shrubs, Trees
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps, Manufacturing Equipment, Machining Equipment, Milling Equipment
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Compressors
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
566
Active Projects
326
Bidding Soon
5,034
All Active Projects
2,377
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 26, 2024

November 4, 2024

img_map_placeholder

NJ-34, Aberdeen, NJ


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Route 34 Force Main, Phase 1

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.