Site work and paving for a mixed-use development in Sartell, Minnesota. Completed plans call for site work for a sidewalk / parking lot; water / sewer project; and for paving for a sidewalk / parking lot.

New street and utility construction, including sanitary sewer, water main, and storm sewer. Major quantities for the Work include: Item Description Unit Estimated Quantity Clearing and Grubbing EACH 11 Clearing and Grubbing ACRE 0.8 Building Removal LUMP SUM 2 Remove Manhole or Catch Basin EACH 7 Remove Gate Valve EACH 2 Remove Hydrant EACH 1 Remove Light Pole EACH 6 Remove Drainage Structure - Special 1 LUMP SUM 1 Abandon Pipe Sewer (Sanitary) LIN FT 750 Remove Water Main LIN FT 770 Remove Sewer Pipe (Storm) LIN FT 320 Remove Sewer Pipe (Sanitary) LIN FT 160 Remove Curb and Gutter LIN FT 840 Remove Concrete Retaining Wall LIN FT 120 Remove Guardrail LIN FT 160 Remove Railroad Track LIN FT 1,260 Remove Concrete Slab, Footing, Foundation SQ YD 1,060 Remove Concrete Pavement SQ YD 500 Remove Bituminous Pavement SQ YD 5,190 Excavation - Gravel & Concrete Debris CU YD 15,120 Non-Structural Embankment (CV) CU YD 19,086 Granular Embankment CU YD 10,200 Recycled Aggregate TON 4,120 Recycled Concrete Berm LIN FT 4,060 Common Topsoil Borrow CU YD 5,540 8-Inch PVC Drainpipe LIN FT 100 12- to 24-Inch RC Pipe Sewer LIN FT 150 Const Drainage Structure Des 48-72 4020 LIN FT 52.4 6-Inch PVC Pipe Sewer LIN FT 40 8- to-12-Inch PVC Pipe Sewer LIN FT 1,843 24-Inch PVC Pipe Sewer LIN FT 10 Const Drainage Structure Design 4007 LIN FT 113.6 Hydrant EACH 6 Gate Valve & Box EACH 15 6-Inch Watermain Ductile Iron Cl 52 LIN FT 70 8- to 16-Inch Watermain Ductile Iron Cl 52 LIN FT 1,600 Irrigation Connection Service EACH 5 Silt Fence; Type Pa LIN FT 1,700 Flotation Silt Curtain Type Moving Water LIN FT 100 Sediment Control Log Type Straw LIN FT 1,720 Seed Mixture 21-112 LB 390 Hydraulic Mulch Matrix LB 9,850 Bid security in the amount of 5 percent of the Bid must accompany each Bid in accordance with the Instructions to Bidders. Any person monitoring the meeting remotely may be responsible for any documented costs. Message and data rates may apply. The Work will be substantially completed on or before May 30, 2025 ; Final completion- June 27, 2025 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing . Questions received less than 10 days prior to the date for opening of Bids may not be answered.

Bid Results

Water / Sewer

$2,025,572.00

Public - City

Paving, Site Work

91

18

2

9

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
117
Active Projects
65
Bidding Soon
1,407
All Active Projects
502
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 17, 2024

November 18, 2024

June 27, 2025

img_map_placeholder

To Be Determined, Sartell, MN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.