Renovation of a municipal facility in New York, New York. Working plans call for the renovation of a municipal facility.

Construction Work for Replace Emergency Generator, Adam C. Powell State Office Building, 163 West 125th Street, New York (New York County), NY The substantial completion date for this project is 708 days after the Agreement is approved by the Comptroller. All successful bidders will be required to furnish a Performance Bond and a Labor and Material Bond pursuant to Sections 136 and 137 of the State Finance Law, each for 100% of the amount of the Contract MBE Goal: 15% WBE Goal: 15% SDVOB Goal: 6% * All bids rejected for the project * Estimated Cost: $500,000 - $1,000,000 Bid Deposit: $34,100.00 The Office of General Services reserves the right to reject any or all bids For all other questions, please send an email to DCPlans@ogs.ny.gov, or call (518) 474-0203. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Municipal

$1,000,000.00

Public - State/Provincial

Renovation

45

59

27

6

Subscribe For Documents

79 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Project Coordination, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Facilities, Vehicular Access and Parking, Haul Routes, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Warranties, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Specialty Placed Concrete, Post-Tensioned Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Metal Decking, Metal Fabrications, Metal Floor Plates
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Heavy Timber
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Fire and Smoke Protection, Applied Fireproofing, Firestopping
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hardware, Door Hardware, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Terrazzo Flooring, Carpeting, Wall Finishes, Wall Coverings, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Interior Specialties, Partitions, Storage Specialties, Lockers
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Vehicle Service Equipment, Parking Control Equipment, Foodservice Equipment, Educational and Scientific Equipment, Laboratory Equipment, Entertainment Equipment, Athletic Equipment, Recreational Equipment
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping, Fire Pumps
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Low-Voltage Electrical Distribution, Low-Voltage Switchgear, Switchboards and Panelboards, Switchboards, Panelboards, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Battery Equipment, Batteries
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Fill, Backfill, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Screening Devices
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Storage Tanks, Communications Utilities, Communications Structures
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
505
Active Projects
306
Bidding Soon
5,292
All Active Projects
2,294
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 25, 2024

May 27, 2025

img_map_placeholder

163 W 125th St, New York, NY

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Replace Emergency Generator - Construction

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.