BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Miami Beach, Florida. Completed plans call for site work for a water / sewer project.

This water system project was recommended in the City's Water System Master Plan (2019), under Project W-45. The project was recommended for installation in the years 2020 - 2025. The City of Miami Beach approved the implementation of capital improvements in accordance with the City's Water Master Plan (2019). In accordance with recommendations in the City's Water Master Plan, the scope of this project is to install new potable water pipelines across Collins Canal at 22nd Street and 23rd Street, and associated improvements. The project includes pipelines of varying diameter (4" to 24") and material types (ductile iron and high-density polyethylene-HDPE), and the construction method includes both Horizontal Direction Drill (HDD) and open cut. The project includes replacing two out-of-service subaqueous water mains with new 20-inch and 16-inch HDPE water mains installed via HDD method requiring four HDD pits and installing ductile iron pipe ranging from 8-inch diameter to 20-inch diameter, installed via open-cut. The work set forth within these contract documents includes the furnishing of all labor, materials, equipment, services, and incidentals necessary to complete the required work described here, including all appurtenant work, complete, tested, and ready for operation, including temporary utilities and facilities as required, all surveying work for layout construction and as-builts, all in conformance with these Contract Documents and City of Miami Beach Public Works Standards. Q & A deadline: Sep 17, 2024 5:00:00 PM EDT Questions must be directed to julissaperez@miamibeachfl.gov with a copy sent to the City Clerk rafaelgranado@miamibeachfl.gov.

Post-Bid

Water / Sewer

$2,351,515.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

70 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
47
Bidding Soon
1,096
All Active Projects
488
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 12, 2024

January 8, 2025

img_map_placeholder

Multiple Locations, Miami Beach, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.