BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 18, 2024 at 8:00 PM

Updated September 19, 2024

Site work and paving for a civil project in New Richmond, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Storm Sewer / Catch Basin Repair. Site Address: 156 E 1ST ST. Description: Repair of an existing failed catch basin. Installation of a new storm structure, concrete pavement, concrete apron and all required associated work. PROJECT SCOPE Provide and maintain traffic control through duration of work Saw cut existing concrete pavement on S. Knowles Ave Saw cut driveway concrete as needed Remove concrete pavement, curb/gutter and apron as needed Remove and replace failed storm sewer structure pipe as needed Install HDPE adjustment rings and re-use existing casting. Replace concrete pavement as shown on provided WisDOT standard detail. Use High Early Strength concrete on S. Knowles (match existing thickness or 8minimum) and open to traffic as soon as possible. Temp gravel patch in driveway Replace concrete apron, curb and gutter Replace concrete driveway (6 min. thickness) Labor and misc. materials to complete above work

Award

Roads / Highways

$19,790.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
251
Active Projects
153
Bidding Soon
1,365
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 29, 2024

October 28, 2024

Project location map

Multiple Locations, New Richmond, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.