BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 17, 2024 at 8:00 PM

Updated August 18, 2024

Site work for a bridge / tunnel in Pensacola, Florida. Completed plans call for site work for a bridge / tunnel.

Provide and install bridge awning over the course of 2-day period. USCG will provide crane for installation. The bridge awning will be constructed in 3 sections and bolted together, covering the area from stbd bridge wing to port bridge wing, crossing in front of the pilothouse. The main support legs will be mounted on the bridge deck combing. The awning canvas will be fabricated with 100% woven polyester fabric, resistant to mildew and UV sunlight. The awning is sewn with non-flammable 100% fluoropolymer fiber,resistant to UV sunlight, salt water, and cleaning chemicals. The cord used to install the awnings is 1/4 inch neobraid polyester, resistant to mold, oil, and stains. The awning frame is fabricated with marine-grade anodized aluminum pipe, cut tosize. Higher-level quality standards are not needed. This requirement is not part of USCG Standardization. 3. Essential physical characteristics: . 1 1/2" SCH40 Anodized Pipe (awning main frame & main support legs) . 1" SCH40 Anodized Pipe (support bows) . 3/4" SCH40 Anodized Pipe (interior perimeter) . TOP GUN Fabric by MarChem CFI . GORE Tenara GoreTex Thread . Neobraid Polyester #6 1/4" Cord

Post-Bid

Bridges / Tunnels

$100,000.00

Public - Federal

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
21
Active Projects
6
Bidding Soon
534
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 15, 2024

September 16, 2024

Project location map

To Be Determined, Pensacola, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.