BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Brownsville, Texas. Completed plans call for site work for a playground / park / athletic field.

As of October 17,2024, this project has not yet been awarded. A timeline for award has not yet been established. BISD Tennis Court Resurfacing Upgrades at Hanna, Pace, & Veterans Memorial ECHS Scope of work consists of: resurfacing the twelve (12) existing Tennis Courts at Hanna. Pace and Veterans Memorial ECHS have (8) eight existing Tennis Courts. This work would include the following: Cleaning, patchwork, 3 coats of color surfacing materials, striping, refurbish net post and new nets. Colors required: fields green, courts blue and lines white The steps involved for applying the acrylic to a prepared asphalt surface are as follows: Prior to applying an Acrylic to the base surface, there needs to be a quick check of the surface to ensure that there will not result any areas which hold water after the application of the Acrylic. The process is to flood the court with water and test for drainage and bird baths. Any areas which do hold water in excess of what the specifications allow need to be patched with an approved patching compound. Asphalt. The steps involved for applying the Acrylic to a prepared Asphalt surface are as follows: (a) apply one coat of 'resurfacer' product; (b) supply and place one or two coats of 'filler' product; (c) supply and place one or two coat of 'finish' product (d) mark one set of playing lines using some Acrylic line product. The asphalt will be placed such that upon rolling, the asphalt layer will achieve a design thickness of 30mm (minimum). The hot-mix asphalt will have a 7mm aggregate and conform to existing grading. Concrete. In the case of a Concrete base, the following steps should be used in applying an Acrylic: (a) acid etch concrete surface and high pressure hose off all residue material; (b) supply and place concrete 'slurry' or primer coating; (c) supply and place one or two coats of 'filler' product; (d) supply and place one or two coats of 'finish' product (e) mark one set of playing lines using acrylic line products. In between coatings of acrylic products, the surface should be checked and remedied for voids, irregularities, roller or squeegee ridges and cleaned of any loose surface materials. Applications of 100% acrylic coatings generally should not be made when ambient temperature is 10 degrees Celsius or less, rain is imminent and always within the manufacturers specifications and recommendations. Tolerances: the surface tolerances should be no greater than 4mm over a three meter straight edge in any direction Question Deadline 08/21/2024 at 3:00 PM CT

Bid Results

Playgrounds / Parks / Athletic Fields

$527,420.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
7
Bidding Soon
271
All Active Projects
116
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 26, 2024

September 25, 2024

img_map_placeholder

Multiple Locations, Brownsville, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.