BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a civil project in Oak Hill, West Virginia. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

Wastewater Treatment Plant Bypass Removal Project. The Project includes the following Work. Construction of a new vortex grit removal system, a new lift station, a new enhanced high-rate treatment (EHRT) auxiliary treatment process, a new additional chlorine contact chamber, a new disinfection feed system, a new post aeration tank, and a new maintenance building. Bids are requested for the following Contract: WWTP Bypass Removal Project (Contract No. 1). The Work will be substantially complete within 335 days after the date when the Contract Times commence to run on the day indicated in the Notice to Proceed and completed and ready for final payment within 365 days after the date when the Contract Times commence to run. Contractor shall pay Owner $2,663.25 for each day that after the time (as duly adjusted pursuant to the Contract) specified for Substantial Completion, until the Work is substantially complete. A five percent (5%) Bid Bond or certified cashier's check must accompany all bids. Each Bidder must submit with his bid, security in the amount, form, and subject to the conditions provided for in the Information for Bidders. Contractors are required to comply with all laws pertaining to prevailing wage rates for the State of West Virginia as issued by the Division of Labor and the federal wage rates issued in accordance with the Davis Bacon Act. The contractor will be required to pay the higher of the state or federal wage rates appropriate for each worker classification. West Virginia Code 21-1D-5 provides that any solicitation for a public improvement construction contract requires each vendor that submits a bid for the work to submit at the same time an affidavit of compliance with the bid. The enclosed Drug Free Workplace affidavit must be signed and submitted in the first envelope as evidence of the Vendor's compliance with the provisions of Article 1D, Chapter 21 of the West Virginia Code. Failure to submit the signed Drug-Free Workplace Affidavit in the first envelope shall result in disqualification of such bid. Bidders on this work will be required to comply with the President's Executive Order No. 11246. The requirements for bidders and contractors under this order are explained in the specifications. P.L. 113-76, Consolidated Appropriations Act, 2014 (Act), includes an "American Iron and Steel (AIS)" requirement in section 436 that requires Clean Water State Revolving Loan Fund (CWSRF) and Drinking Water State Revolving Loan Fund (DWSRF) assistance recipients to use iron and steel products that are produced in the United States for projects for the construction, alteration, maintenance, or repair of a public water system or treatment works. Section 746 of Title VII of the Consolidated Appropriations Act of 2017 (Division A - Agriculture, Rural Development, Food and Drug Administration, and Related Agencies Appropriations Act, 2017) and subsequent statutes mandating domestic preference applies an American Iron and Steel requirement to this project. All iron and steel products used in this project must be produced in the United States. The term "iron and steel products" means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and Construction Materials. The Owner reserves the right to reject any or all bids. No Bidder may withdraw his bid within 90 days after the actual date of the opening thereof. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Water / Sewer

$5,400,000.00

Public - City

New Construction, Site Work

76

29

17

4

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
152
Active Projects
57
Bidding Soon
710
All Active Projects
396
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 17, 2024

November 18, 2024

October 9, 2025

img_map_placeholder

To Be Determined, Oak Hill, WV

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.