BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a bridge / tunnel in Bolivar, Missouri. Conceptual plans call for site work for a bridge / tunnel.

Engineering services to assist in design and completion of the replacement of E Division Bridge, located at coordinates 37.618689, -93.386835. The engineering responsibilities may include but are not limited to the following: The preparation of Conceptual plans, Preliminary plans, Contract plans and Right of Way Plans. Design services may include, right of way plans, surveying, geotechnical investigations, public involvement, environmental and historic preservation services/permits, contract documents, assisting with the bidding process, construction support/construction inspection, utility coordination/permits and traffic controls including the preparation of PS&E and final documents. The preparation of Conceptual plans, Preliminary plans, Contract plans, Right of Way Plans, preparing and submitting necessary Construction Phase: work with contractor on behalf of the Bolivar Special Road District, assist with preconstruction conference, perform periodic site inspection, prepare change orders, inspect construction materials, check shop drawings submitted by contractor, conduct construction test and inspection, be present during critical construction operations, work with Bolivar Special Road District to do full time inspections and reporting and participate in final inspection. The Bolivar Special Road District is looking to replace the E Division Bridge, located at coordinates 37.618689, -93.386835. The existing bridge would be replaced with a new 35-foot long, single-span precast concrete slab beam bridge which would consist of eight equal width beams and rest on a cast-in-place concrete pile cap with turnback wingwalls Approximate Construction Cost: $300,000 - $500,000 DBE Goal Determination: 5 % The method of Contractor Selection has not been Determined at this time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Bridges / Tunnels

$500,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
17
Bidding Soon
340
All Active Projects
143
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 4, 2025

img_map_placeholder

Multiple Locations, Bolivar, MO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.