BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 28, 2025 at 8:00 PM

Updated August 12, 2025

Site work, paving and outdoor lighting for a mixed-use development in San Diego, California. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; road / highway; for outdoor lighting for a road / highway; road / highway; and water / sewer project.

https://www.sacbee.com/news/article307322356.html Construction could begin in the summer for bike lanes on a 2.8-mile stretch of University Avenue between Estrella Avenue and 69th Street. It is part of a larger reshaping of streets and bike infrastructure in North Park and Mid-City neighborhoods that has been planned by SANDAG for well over a decade. ______________________ Reference Number 0000378656 The work consists in general of approximately 2.8 miles of Class II and Class IV bikeway along University Avenue between Estrella Avenue and 69th Street within the City of San Diego and approximately 0.25 miles of Bike Boulevard improvements on Estrella Avenue between Orange Avenue and University Avenue. Roadway improvements are required to accommodate the bikeway. Features include raised concrete medians, concrete curb & gutter, asphalt concrete dike, bus islands, a protected intersection, street lighting, traffic signal modifications and other traffic safety measures linked to signage and striping. Work includes, but not limited to, controlling for water pollution; traffic control; erosion control; clearing and grubbing; curb, gutter, cross gutter, driveway, colored concrete, and sidewalk work; roadway excavation; imported borrow; asphalt concrete pavement; PCC pavement; landscaping and irrigation; proprietary BMPs; wayfinding signage; pavement markings and signage; street lighting; trenching and backfill for underground electric conduits; water appurtenances and fire hydrant relocations; storm drain installation; traffic signal modifications. Additive alternate A consists of pavement rehabilitation and associated curb ramps, traffic signal modifications and other appurtenant work associated with rehabilitating the roadway along University Avenue. Question Acceptance Deadline 03/27/2025 08:00 PM EDT Questions are submitted online Yes Participation Requirements - Disadvantaged Business Enterprise (DBE) General Requirements - Contractors License Required - Federally Funded - Insurance Required - Prevailing Wage Required Bonding Requirements - Bid Bond 10 % - Performance Bond 100 % - Payment Bond 100 %

Post-Bid

Sidewalks / Parking Lot

$23,446,836.00

Public - City

Outdoor Lighting, Paving, Site Work

229

17

32

6

Subscribe For Documents

129 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
266
Active Projects
133
Bidding Soon
1,323
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 10, 2025

June 9, 2025

Project location map

University Ave, San Diego, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.