BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a mixed-use development in Tuba City, Arizona. Completed plans call for the renovation of a residential development; and water / sewer project.

The Tuba City Unified School District, #15 has an estimated budget of $1,000,000. for the entire first project to build out during the next year. The site is located at 300 Grand View Street and consists of a Total Rehab of a-quadplex all under one roof. The final completion date is June 1, 2025. The second phase will begin, following the completion of Phase 1. All units will be vacated prior to construction. HCM Testing will be completed as well. Bid Bond* Please upload a Bid Bond for 10% of the construction budget of $1,000,000. This can be a copy of the fully executed bond. The amount of the performance bond shall be the price of construction and shall not include the cost of any design services, preconstruction services, finance services, maintenance services, operations services and other related services included in the contract. This bond is solely for the protection of the school district. The conditions and provisions of the performance bond regarding the surety’s obligations shall follow the form required under A.R.S. § 34-222(G) or A.R.S. § 34-610(G), as applicable. For design-bid-build construction, the bonds prescribed in subsection (A) shall be provided on and at the same time as execution of the construction contract. For construction-man- ager-at-risk, design-build and job-order-contracting construction services, the bonds prescribed in subsection (A) shall be provided only on and at the same time as execution of a contract or contract modification that commits the contractor to provide construction for a fixed price, guaranteed maximum price or other fixed amount within a designated time frame A payment bond that is executed and furnished as required by Arizona Revised Statutes Title 34, Chapter 2, Article 2 or Chapter 6, as applicable, in an amount equal to one hundred percent of the price specified in the contract for the protection of all persons supplying labor or material to the contractor or its subcontractors for the performance of the construction provided for in the contract

Award

Water / Sewer

$1,000,000.00

Public - City

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
3
Active Projects
1
Bidding Soon
40
All Active Projects
10
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 30, 2024

October 30, 2024

img_map_placeholder

Multiple Locations, Tuba City, AZ


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.