BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a mixed-use development in Dunwoody, Georgia. Working plans call for site work for a playground / park / athletic field; road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; for the demolition of a pre-engineered storage facility; for the construction of a playground / park / athletic field; pre-engineered storage facility; and water / sewer project.

The owner has determined a prequalified list of construction managers. Brook Run Park Maintenance Facility Building and Grounds Vandermeer Management, LLC , on behalf of the City of Dunwoody is seeking Statements of Qualifications and Proposals from qualified General Contractors to provide preconstruction and construction management services for their Facilities Maintenance Building project at Brook Run Park. The project encompasses a +/- 8,400 SF two-floor facilities maintenance structure on a site of approximately +/- 1.0 acres located at the intersection of DeKalb Drive and Peeler Road at Brook Run Park. The existing brick structure, approximately 11,000 SF, is to be demolished and a new preengineered metal building structure is to be erected in its place. The first level of the new structure will be comprised of cast-in-place retaining walls and a CMU wall facing loading dock area. The second level will be comprised of a pre-engineered metal building. The new structure will contain loading docks, secured vendor storage, tool room with workbench, drive-in storage and toilet on the ground floor. Top floor will contain vendor and city official offices, breakroom with lockers, conference room, toilets, shower, storage room, IT and Mechanical rooms, and janitorial closets. A fenced parking encompasses parking for employees, material and equipment storage areas, dumpsters, fueling area with above ground tanks, heavy duty concrete paving, asphalt paving and striping. Site grading work will be required to include repair and new construction of retaining walls and installation of a bio-cell pond. Current electrical service is 3-phase 600A main panel with (4) sub-panels ranging from 100A- 225A. Upgrades to electrical service may be required. Value Engineer and design recommendations are encouraged based on the schematic design and narratives Preconstruction Phase Services. During the Preconstruction Phase, the Contractor will work cooperatively with Vandermeer Management to provide a guaranteed maximum price proposal for the project including any value engineering identified. The estimate is to be broken down by CSI division as indicated in the attached bid form. Construction Phase Services. The Construction Phase services will require the Contractor to execute the Project to be constructed pursuant to the Construction Documents and in accordance with the AIA GMP Contract and the Project Schedule. The Contractor shall be fully responsible for the means and methods of construction, Project safety and for Project completion within the Project Schedule Question Deadline 08/30/2024 at 12:00 PM ET Request for Information Questions due from Contractors to Owner Project Manager . Issue responses to questions/requests for clarifications 9/10/24 The anticipated start date of construction is February 2024, contingent upon permit receipt and material procurement. A detailed schedule will be required by the General Contractor as part of the RFP response deliverables. In addition to the overall project schedule a site logistics plan is recommended. The Project Manager reserves the right to adjust the schedule as the Owner and/or the Project Manager deem necessary

Final Planning

Warehouse / Distribution - Pre-Engineered Storage Building

$115,000.00

Public - City

Demolition, New Construction, Paving, Site Work

8

4

10

3

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
117
Active Projects
50
Bidding Soon
1,481
All Active Projects
556
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 20, 2024

January 20, 2025

img_map_placeholder

Dekalb Dr & Peeler Rd, Dunwoody, GA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.