Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and renovation of an educational facility in Ocala, Florida. Completed plans call for the renovation of a 291,000-square-foot, 113-acre educational facility; and for site work for a educational facility.
Construct a new 1,800-student station High School in East Marion Oaks with provisions for future expansion. The school is expected to be approximately 291,000 sf of finished floor space on a 113-acre lot. The school will consist of Several buildings that house all components of the school with separate buildings for the auditorium, cafeteria and gym, as well as athletic fields and field houses. Wharton-Smith, Inc. is the Construction Manager proudly serving Marion County Schools and is soliciting proposals from prequalified subcontractors for the construction of High School CCC: Bid Package #1 Mass Grading and Bid Package #3 Early Procurement of Equipment. Subcontractor bids are being solicited to complete the early site package consisting of the following scopes of work: Bid Package #1: Mass Grading Site clearing and mass grading. Bid Package #3: Early Procurement of Equipment Purchase water-cooled chillers, cooling towers, pump skids, electrical switchgear, and emergency generator. Construction is tentatively scheduled to start November 2024. The main bid package including the remaining site work and buildings is tentatively scheduled to bid in late January 2025, with construction starting in April 2025 and finishing in July 2026. RFI's are due by 2:00 PM on Thursday, August 29, and may be emailed to comest@whartonsmith.com. Please do not contact the Architect or Owner for information on this project. All bidding subcontractors shall adhere to having all onsite personnel registered with a valid JLA Badge, per Florida Statues 1012.32, 1012.465, 1012.467 & 1012.468 at the end of the project, once school staff is onsite. All costs for new employee badging & renewals will be the sole responsibility of the bidding subcontractor. MWBE and local Subcontractors & Suppliers are encouraged to participate. Payment & Performance Bonds may be required.
Post-Bid
Educational
$130,000,000.00
Public - County
Renovation, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 12, 2024
November 4, 2024
Marion Oaks Manor, Ocala, FL
Related To This Project
Ocala, FL
Bid Date: Oct 04 2024
Ocala, FL
Bid Date: Oct 11 2024
Ocala, FL
Bid Date: Sep 17 2024
Ocala, FL
Bid Date: Oct 17 2024
Ocala, FL
Bid Date: Aug 22 2024
Ocala, FL
--
Ocala, FL
Bid Date: Sep 12 2024
Ocala, FL
--
Ocala, FL
--
Ocala, FL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.