BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and new construction of a retail development in Woodbine, Iowa. Completed plans call for the demolition of a retail development; for the construction of a 7,200-square-foot retail development; and for site work for a retail development.

Bids for the Demolition of two (2) obsolete pole-style buildings, Grading, and Construction of a new 60 x 120 x 16 maintenance shop, at the Willow Lake Recreation Area, 2725 Easton Trail, Woodbine, Iowa 51579. Bids should include all costs related to materials, hauling, and labor. Project Objectives are in Two (2) parts: Part One: * Demolition or Removal of two existing pole-style buildings, including concrete. * Grading of site to desired elevations. * Creation of new entrance roadway to the Willow Lake Nature Center. Part Two: * Construction of new 60 ft X 120 X 16 ft building, to include concrete slab and approaches. Project completion date: December 20, 2024. The awarded contractor must provide proof of insurance and work closely with HCCB staff.

Post-Bid

Retail

$100,000.00

Public - County

Demolition, New Construction, Site Work

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
137
Active Projects
70
Bidding Soon
946
All Active Projects
378
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 6, 2024

October 7, 2024

December 20, 2024

img_map_placeholder

2725 Easton Trail, Woodbine, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.