Site work and paving for a road / highway in De Pere, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of September 13, 2024. Project was awarded to Fahrner Asphalt Sealers in the amount of $58,527.50. Upon entering a contract with the Village of Bellevue, insurance certificates and bonds representing the following must be presented by the party submitting successful proposal. The Contractor shall furnish the VILLAGE with certificates of insurance as evidence of the required coverages. The certificates are to be on the form provided by the VILLAGE and must be received and approved by the VILLAGE before work commences. The VILLAGE reserves the right to require the Contractor to furnish complete, certified copies of all required insurance policies, at any time. The form of certificate is included in the Invitation for Bids for this project. The VILLAGE'S failure to notice or notify the Contractor of any coverage deficiencies that may be apparent in the documents submitted to the VILLAGE shall not relieve the Contractor of responsibility to provide coverage required in this contract. The Contractor shall provide an Umbrella Liability Policy of: TWO MILLION DOLLARS ($2,000,000). The cancellation clause on all certificates of insurance shall read as follows: "Should any of the abovedescribed policies be cancelled before the expirations date thereof, the issuing company will mail 30 days written notice to the certificate holder named herein." (No modification to this clause will be accepted.) VILLAGE OF BELLEVUE 2024 Chip Sealing Project CONTRACT CS-24 VILLAGE OF BELLEVUE CHIP SEALING SPECIFICATIONS Pavement Chip Sealing The chip sealing process will consist of a polymer emulsified asphalt blend and a 100 % fractured 3/8 washed limestone chip or 3/8 dark colored granite chip which shall not exceed 3/8" in size. Both asphalt and aggregate will be applied to one half of the roadway at a time to allow for continuous flow of traffic. The polymer asphalt emulsion shall be applied at 170 degrees and be evenly distributed by a spray distributor. Road surface shall be cleaned by a self-propelled broom within seven (7) days of application and any necessary cold mix or hot mix patching installed prior to chip sealing. The finished chip seal will be rolled and set in place with a duo packer roller. Cold mix asphalt for wedge patching will be produced using a SC-800 asphalt and a crushed stone and washed sand aggregate mixture with a top size not exceeding 1/2 " Bid shall give a price estimate as an alternate to have village staff complete any necessary cold or hot mix patching installed prior to chip sealing. Pavement Sweeping Contractor shall be responsible for sweeping and removing all loose limestone or granite chip material no sooner than (5) business days from application of the chip seal surface. Disposal of loose material shall be the responsibility of the Contractor. Fog Sealing Application Upon completion of the chip sealing process, Contractor shall Fog Seal roadways selected by Bellevue using a single layer of emulsified asphalt. Fog sealing shall not be applied any sooner than (5) days and no later than (14) days from chip seal application. Road surface shall be free and clear of loose chip and debris prior to fog application. Concrete driveways shall be protected so as not to overspray concrete in the sealing process. Traffic Control The awarded contractor is responsible for following traffic control in accordance with MUTCD guidelines. All costs for traffic control will be at the expense of the contractor. Hours of Operations (Work Hours) In accordance with the Village of Bellevue Ordinance 188-4. The crack fill operations must take place Monday - Friday 7a-3:00p. There shall be no construction-related activity beyond the hours listed above which disturbs the peace and quiet of any neighborhood. The Village of Bellevue will be accepting its Chip Sealing bids for 2024. We are hereby requesting you to submit a proposal to this office. The Village reserves the right to reject any or all bids, waive any in informality in the bids received and to accept any proposal which they deem most favorable to the interest of the Village. Road Name Bower Creek Road Length 1.6 (Miles) 21' Width (Feet) Price per square yard Price/Ton & Tons Estimated Village Cost Contract CS-24 to be completed by October 11th, 2024

Award

Roads / Highways

$58,528.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
30
Active Projects
15
Bidding Soon
265
All Active Projects
107
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 27, 2024

September 26, 2024

img_map_placeholder

Bower Creek Rd, De Pere, WI

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.