BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Rancho Santa Margarita, California. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

SCOPE OF WORK The work to be performed and completed by Contractor consists of mobilization, traffic control, clearing and grubbing, best management practices, remove and replace existing sidewalk, and all other incidental work in this specification document. LOCATION OF WORK The Project is located at various locations citywide, as shown on the plans. TIME OF COMPLETION The Contractor shall complete all work in every detail within 35 working days after the date of the Notice to Proceed. WORKING HOURS The Contractor's activities shall be confined to the hours between 8:00 AM and 5:00 PM, Monday through Friday, excluding holidays, unless otherwise specified. Work shall be prohibited on Saturday, Sunday or Federal Holidays except as provided herein. Deviation from these hours will not be permitted without the prior consent of the Engineer, except in emergencies involving immediate hazard to persons or property. Construction activities during City Special Events may be restricted by the City on primary arterial or access roads leading to the Special Events. The Contractor is responsible for requesting the schedule of Special Event prior to submitting a bid proposal and to plan their work accordingly during Special Events. No separate payment will be made for restrictions during Special Events, and payment shall be considered as included in the Contract Price. TRAFFIC REQUIREMENTS The Contractor shall provide delineation in accordance with the latest updated version of the California Manual on Uniform Traffic Control Devices (MUTCD). The Contractor shall schedule the order of his work such that no travel lanes are closed before 9:00 A.M. or after 3:30 P.M. daily. A minimum of one through travel lane in each direction and one turning lane in each direction shall be maintained at all times during construction between 9:00 A.M. and 3:30 P.M, unless otherwise approved by City in writing. The same number of travel lanes currently in use (at the time of bid) shall be opened to traffic each and every day between 3:30 P.M. and 9:00 A.M. No work that interferes with public traffic shall be performed after 3:30 P.M. or before 9:00 A.M. No street closures shall be made. The traffic signal and traffic signal detectors shall remain operational during the construction until their replacement is scheduled within 5 days of disruption. Night work shall only be allowed with approved, written approval by the City Engineer, at the contractor's request, and shall be completed at no additional cost if approved. Separation between travel lanes shall be accomplished by the use of delineators placed at a maximum of 15' on center. Traffic channelization at intersections shall be accomplished by the use of delineators placed at a maximum of 10' on center.

Bid Results

Sidewalks / Parking Lot

$80,750.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
559
Active Projects
261
Bidding Soon
4,086
All Active Projects
1,877
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 10, 2024

October 10, 2024

November 28, 2024

img_map_placeholder

Multiple Locations, Rancho Santa Margarita, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.