Site work for a road / highway in Canton, Ohio. Completed plans call for site work for a road / highway.

Bid envelopes shall be marked: T-1-2024 643 LONG-LINE PM PROJECT, PID #119264 On and after August 15, 2024, from 7:30 AM to 4:00 PM, Monday through Friday, specifications and other contract documents are on file for review at: Stark County Engineer's Office, 5165 Southway Street SW, Canton, Ohio 44706. (Phone 330-477-6781) Only bidders of record will receive addendum to the specification, if any. The County nor AA Blueprint is not responsible if bidding documents so mailed are received too late for filing a timely bid. The only bids that will be accepted will be those of bidders of record. Bidders of record are those who have signed the bidders list, obtained specifications and paid the prescribed fee. The Engineer's Estimate for this project is: $ 212,000.00. Construction Work shall be completed by October 31, 2024. Upon receiving a responsible and responsive low bid, the County will proceed with Award of the Contract. Each bidder shall be in current good standing on the Ohio Department of Transportation Pre-qualified Contractors List kept by the Office of Contracts. Construction work shall be subject to the Federal prevailing wage rates established for Ohio by the Secretary of Labor's general wage decision. Each bid shall be in conformity with the Ohio Revised Code and all bids and certificates shall be upon the forms furnished with the specifications. All bids shall be delivered to the office of the Stark County Commissioners, at or prior to the date and hour specified for receiving bids. In the case of corporations not chartered in the State of Ohio, the bid shall be accompanied by a proper certificate of the Secretary of State, certifying that such corporation is authorized to do business in Ohio. Each bid shall be accompanied by a bid guaranty in the form of (1) a certified check, or cashier's check, or letter of credit equal to ten percent (10%) of the bid; or (2) a bid guaranty bond for the full amount of the bid; both forms of guaranties as provided in Chapter 153 of the Ohio Revised Code and in the project specifications. The amount of the bid for said guaranty purposes shall include all additive alternates. All bid guaranties shall be conditioned that if the bid is accepted within sixty (60) days of the bid opening, a proper contract shall be executed and that upon failure or refusal to enter into said contract within ten (10) days after receipt of notification of award, the bidder and the surety on any bond shall be liable to the County in an amount not to exceed ten (10) percent of the bid. Bidders shall comply with the Affirmative Action-Equal Employment Opportunity requirements set forth in the specifications. A Bidder/Contractor will be deemed committed to the goal of such bid conditions by submitting a properly signed bid. Each bidder must insure that all employees and applicants for employment are not discriminated against because of race, color, religion, sex, handicap or national origin. Terms of payment shall be as provided in Chapter 153 of the Ohio Revised Code. All steel products must meet the requirements of ODOT CMS 106.09 The Stark County Commissioners reserve the right to reject any or all bids, to waive any informalities or irregularities in the bids received, and to accept any bid which is deemed most favorable to the County at the time and under the conditions stipulated. The Engineer will review all bids for irregularities and unbalancing. Any unbalancing or irregularities found may be cause for rejection of the entire bid. The commissioners further declare that they will award the contract for this project to the lowest and best bid which may not necessarily be the lowest bid. No single factor will control the Board's decision to award, and the Board reserves the right to exercise its full discretion. "Disadvantaged Business (DBE) Requirement. DBE participation goals (Subcontracts, materials, supplies) have been set on this project for those certified as DBE's in accordance with the TEA - 21 (1998) and 49 CFR, Part 26, and qualified to bid with ODOT under Chapter 5525 of the Ohio Revised Code (O.R.C.)". At the beginning following the project identification the DBE goal designation is written, i.e. DBE Goal: " 0% ". WAIVER PROCESS FOR DBE GOALS: In the event the Contractor is unable to meet the DBE Goal placed on this project, a request for waiver of all or part of the goal may be made to the Ohio Department of Transportation with a copy sent to the LPA. The written request must indicate that a good faith effort was made to meet the goal and be sent to the ODOT DISTRICT 4 LPA COORDINATOR. The Planning and Programs Administrator will review the request and then forward it to the Department's Central Office. Central Office will review the submitted documentation and decide the issue within (3) business days. There will be no extension of the time for the project granted if the prime Contractor wishes to avail himself of this process. The LPA will be notified as to the decision. Record Retention - As the LPA, ODOT or the United States government may legitimately request from time to time, the contractor agrees to make available for inspection and/or reproduction by the LPA, ODOT or United States government, all records, books, and other documents of every kind description that relate to this contract. Drug-Free Work Place - The Contractor and all subcontractors for this project must be enrolled in the Ohio Bureau of Workers' Compensation Drug-Free Workplace Program or in a similar program approved by the Bureau of Workers' Compensation and in good standing with the Bureau of Workers' Compensation. Contractors that are not previously enrolled in a drug-free workplace program must enroll in such a program within 10 days of the bid opening. Any Contractor that does not meet this requirement will have their bid deemed non-responsive and cannot be awarded the contract. The undersigned, having full knowledge ofthe site, plans and specifications tbr the following improvement and the condition ofthis proposal, hereby agrees to furnish all services, labor, materials, and equipment necessary to complete the entire project according to the plans, specifications and completion date. I accept the unit prices specified below for each item as full compensation for the work in this proposal. Question Deadline 09/02/2024 at 10:00 AM ET If any questions or clarifications are needed answered, please email them to us prior and we will address them accordingly.

Award

Roads / Highways

$204,252.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
120
Active Projects
64
Bidding Soon
1,150
All Active Projects
451
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 6, 2024

October 7, 2024

img_map_placeholder

Multiple Locations, Canton, OH

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.