BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 22, 2024 at 8:00 PM

Updated August 23, 2024

Site work for a civil project in Lincoln, Nebraska. Conceptual plans call for site work for a water / sewer project.

The University of Nebraska intends to procure a qualified Architect / Engineer (A/E) to provide program development and verification, design, preliminary cost estimating, permitting assistance, and construction administration services for the UNMC Thermal Energy Storage (TES). The estimated construction cost under a Construction Manager at Risk (CMR) is $42,000,000. The total estimated construction budget including the GMP, in-house construction services, and the Owner's contingency is $57,000,000. The proposed project is to construct a new Thermal Energy Storage (TES) tank and associated pump house. Preliminary studies suggest an approximate tank volume of 3,500,000 gallons. The pump house will be sized to incorporate future campus capacity needs for chilled water, heating hot water, normal power, and emergency power. It is anticipated that additional feeds from Omaha Public Power District will need to be considered to power the TES and associated pump house. All utilities described above will be tied into the existing campus utility system, including ties to the adjacent East Utility Plant (EUP). The architecture of the tank and pump house is not yet determined. It will be important that the architecture aligns with adjacent campus and neighborhood facilities. Question Deadline 08/22/2024 at 12:00 PM CT All questions/clarifications regarding this RFQ must be submitted in this eBid system by the date and time indicated. Questions must be submitted to ebid@nebraska.edu. The University of Nebraska will respond to any questions or clarifications submitted via email through this eBid system by the deadline date. Those responses will be posted on this bid via an addendum. 8/26/2024 05:00 PM (ET) The Scope of the work and preliminary schedule is more completely described in the BOR approved Program Statement dated August 8, 2024, and in other documents included in this RFQ. The method of Contractor Selection has not been Determined at this time.

Conceptual

Water / Sewer

$57,000,000.00

Public - State/Provincial

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
134
Active Projects
87
Bidding Soon
854
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2025

Project location map

To Be Determined, Lincoln, NE

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.