BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Lincoln, Nebraska. Conceptual plans call for site work for a water / sewer project.

The University of Nebraska intends to procure a qualified Architect / Engineer (A/E) to provide program development and verification, design, preliminary cost estimating, permitting assistance, and construction administration services for the UNMC Thermal Energy Storage (TES). The estimated construction cost under a Construction Manager at Risk (CMR) is $42,000,000. The total estimated construction budget including the GMP, in-house construction services, and the Owner's contingency is $57,000,000. The proposed project is to construct a new Thermal Energy Storage (TES) tank and associated pump house. Preliminary studies suggest an approximate tank volume of 3,500,000 gallons. The pump house will be sized to incorporate future campus capacity needs for chilled water, heating hot water, normal power, and emergency power. It is anticipated that additional feeds from Omaha Public Power District will need to be considered to power the TES and associated pump house. All utilities described above will be tied into the existing campus utility system, including ties to the adjacent East Utility Plant (EUP). The architecture of the tank and pump house is not yet determined. It will be important that the architecture aligns with adjacent campus and neighborhood facilities. Question Deadline 08/22/2024 at 12:00 PM CT All questions/clarifications regarding this RFQ must be submitted in this eBid system by the date and time indicated. Questions must be submitted to ebid@nebraska.edu. The University of Nebraska will respond to any questions or clarifications submitted via email through this eBid system by the deadline date. Those responses will be posted on this bid via an addendum. 8/26/2024 05:00 PM (ET) The Scope of the work and preliminary schedule is more completely described in the BOR approved Program Statement dated August 8, 2024, and in other documents included in this RFQ. The method of Contractor Selection has not been Determined at this time.

Conceptual

Water / Sewer

$57,000,000.00

Public - State/Provincial

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
53
Active Projects
30
Bidding Soon
486
All Active Projects
194
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2025

img_map_placeholder

To Be Determined, Lincoln, NE

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.