BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 13, 2024 at 8:00 PM

Updated September 14, 2024

Site work for a bridge / tunnel in Smyrna, Georgia. Completed plans call for site work for a bridge / tunnel.

Project Description: This project consists of the stabilization of the slopes around and under Camp Highland Road Bridge over the Silver Comet Trail. Project Duration: The time allowed for performance of the project will be 180 days from issuance of Notice to Proceed. Disadvantaged Business Enterprise (DBE) Participation and Small Business Participation in all DOT contracts is encouraged. The Cobb County Board of Commissioners reserves the right to reject all Bids and waive any formalities.

Bid Results

Bridges / Tunnels

$4,443,108.00

Public - County

Site Work

4

4

2

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
277
Active Projects
126
Bidding Soon
2,074
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 12, 2024

November 11, 2024

Project location map

Camp Highland Rd, Smyrna, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.