Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 13, 2024 at 8:00 PM

Updated September 14, 2024

Site work for a bridge / tunnel in Smyrna, Georgia. Completed plans call for site work for a bridge / tunnel.

Project Description: This project consists of the stabilization of the slopes around and under Camp Highland Road Bridge over the Silver Comet Trail. Project Duration: The time allowed for performance of the project will be 180 days from issuance of Notice to Proceed. Disadvantaged Business Enterprise (DBE) Participation and Small Business Participation in all DOT contracts is encouraged. The Cobb County Board of Commissioners reserves the right to reject all Bids and waive any formalities.

Bid Results

Bridges / Tunnels

$4,443,108.00

Public - County

Site Work

4

4

2

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
345
Active Projects
164
Bidding Soon
2,177
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 12, 2024

November 11, 2024

Project location map

Camp Highland Rd, Smyrna, GA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed