Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Auburn Hills, Michigan. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
Reference Number 0000360617 The City of Auburn Hills is seeking responses from qualified vendors to repave the cart path and improve drainage on hole 15 at the Fieldstone Golf Club in the Fall of 2024. Job Location 1984 Taylor Road Auburn Hills, MI 48326 Question Deadline 08/29/2024 at 4:00 PM ET Questions are submitted online No. Please direct your questions by email to Chip Hierlihy, PGA Member Professional - chierlihy@auburnhills.org . SCOPE OF WORK The City of Auburn Hills requires that all work specified in this Request for Proposal (RFP) be completed no later than December 1st, 2024 Remove and replace approximately 370feet of existing deteriorated asphalt cart path and extending the pathway an estimated 200 feet additional on hole 15 at Fieldstone Golf Club. This includes the removal of any tree roots that are causing damage to the existing path. Re-grading and installation of a minimum 4 inches of 21 AA limestone aggregate base as necessary to provide a stable base for the new asphalt path. Paving of cart path with a minimum of 3 inches of HMA 5EML asphalt. The new cart path should match the existing widths and follow the current alignment. Assessment of drainage issues in the areas approximately 457linear feet along cart path on hole 15. These areas have exhibited pooling water and soggy conditions that are impacting the path and surrounding turf. Construction of drainage improvements to alleviate the identified pooling issues related to the existing grade flaws. Contractor is responsible for mobilization of equipment, installation of any temporary roads/paths needed for equipment or material access, and removal of these temporary access ways upon completion. Contractor shall restore any areas of turf, landscaping, or other property disturbed by the work to their original condition or better. Contractor shall coordinate with Fieldstone Golf Club staff to relocate or adjust any irrigation components impacted by the project. Any irrigation components damaged during construction shall be repaired or replaced by the contractor at no additional cost. Contractor is required to provide detailed list of needs during construction and a detailed plan of how construction will be performed while the course is open and play continues.
Post-Bid
Sidewalks / Parking Lot
$300,000.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Sign-up for Instant Access.
Provide your information to unlock 5 active projects and companies from our commercial construction database. Free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
September 3, 2024
October 3, 2024
December 1, 2024
1984 Taylor Ct, Auburn Hills, MI
Related To This Project
Auburn Hills, MI
Bid Date: Sep 10 2024
Auburn Hills, MI
Bid Date: Sep 10 2024
Auburn Hills, MI
Bid Date: Oct 01 2024
Auburn Hills, MI
Bid Date: Oct 02 2024
Auburn Hills, MI
Bid Date: Aug 21 2024
Auburn Hills, MI
--
Auburn Hills, MI
--
Auburn Hills, MI
--
Auburn Hills, MI
--
Auburn Hills, MI
--
Auburn Hills, MI
Bid Date: Aug 23 2024
Auburn Hills, MI
--
Auburn Hills, MI
Bid Date: Aug 13 2024
Auburn Hills, MI
--
Auburn Hills, MI
Bid Date: Aug 30 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--