BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 26, 2024 at 8:00 PM

Updated September 27, 2024

Site work and paving for a mixed-use development in Auburn Hills, Michigan. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Reference Number 0000360617 The City of Auburn Hills is seeking responses from qualified vendors to repave the cart path and improve drainage on hole 15 at the Fieldstone Golf Club in the Fall of 2024. Job Location 1984 Taylor Road Auburn Hills, MI 48326 Question Deadline 08/29/2024 at 4:00 PM ET Questions are submitted online No. Please direct your questions by email to Chip Hierlihy, PGA Member Professional - chierlihy@auburnhills.org . SCOPE OF WORK The City of Auburn Hills requires that all work specified in this Request for Proposal (RFP) be completed no later than December 1st, 2024 Remove and replace approximately 370feet of existing deteriorated asphalt cart path and extending the pathway an estimated 200 feet additional on hole 15 at Fieldstone Golf Club. This includes the removal of any tree roots that are causing damage to the existing path. Re-grading and installation of a minimum 4 inches of 21 AA limestone aggregate base as necessary to provide a stable base for the new asphalt path. Paving of cart path with a minimum of 3 inches of HMA 5EML asphalt. The new cart path should match the existing widths and follow the current alignment. Assessment of drainage issues in the areas approximately 457linear feet along cart path on hole 15. These areas have exhibited pooling water and soggy conditions that are impacting the path and surrounding turf. Construction of drainage improvements to alleviate the identified pooling issues related to the existing grade flaws. Contractor is responsible for mobilization of equipment, installation of any temporary roads/paths needed for equipment or material access, and removal of these temporary access ways upon completion. Contractor shall restore any areas of turf, landscaping, or other property disturbed by the work to their original condition or better. Contractor shall coordinate with Fieldstone Golf Club staff to relocate or adjust any irrigation components impacted by the project. Any irrigation components damaged during construction shall be repaired or replaced by the contractor at no additional cost. Contractor is required to provide detailed list of needs during construction and a detailed plan of how construction will be performed while the course is open and play continues.

Award

Sidewalks / Parking Lot

$43,750.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
324
Active Projects
123
Bidding Soon
2,378
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 3, 2024

October 3, 2024

Project location map

1984 Taylor Ct, Auburn Hills, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.