Published September 13, 2024 at 8:00 PM

Updated October 1, 2024

Renovation of a municipal facility in State College, Pennsylvania. Completed plans call for the renovation of a municipal facility.

The State College Area School District is seeking proposals for the interior renovation of existing office space with minor finish upgrades in other spaces at Panorama Village in State College, PA as noted on drawings and specifications prepared by Hoffman Leakey Architects and Reese Hackman Engineering. All work related to the Board Room must be completed within the construction window of October 1st , 2024 - October 20th , 2024. Notice to Proceed September 10, 2024 Start Construction September 23, 2024 Complete Project January 27, 2025 Question Deadline 08/28/2024 at 12:00 PM ET - LIQUIDATED DAMAGES: Bidder must agree to begin work contemplated by this contract within five (5) days after the date specified in the Notice to Proceed as the starting date and to compete the work by January 27, 2025. Bidder must agree to pay to the owner as liquidated damages and not as a penalty, the sum of Seven Hundred and Fifty Dollars ($750) per calendar day; the Contractor and its surety shall be liable for the amount thereof. In addition, all work after that date will need to be performed after 3:00 pm or on weekends at no additional cost to the School District. All work relating to this project shall be subject to all federal, state and local codes, ordinances and regulations regarding occupational safety and health, environmental protection and construction standards. Nothing contained in the specifications or the drawings shall be construed to conflict with such laws, codes, ordinances or regulations, and in the event of such conflict any requirement imposed by law, ordinances or regulation shall be deemed controlling. Conditions: The Pennsylvania Prevailing Wage Act No. 442, August 15, 1961 and amended August 9, 1963 will apply on this project. BID GUARANTY: A Bid Guaranty in the form of a Certified Check or a Surety Company's Bid Bond shall be submitted with the Proposal in an amount of not less than ten percent (10%) of the total Bid amount. In the event that any Bidders shall, upon the award of a contract, fail to comply with the terms of the proposal and/or Contract Documents, the amount of the Bid Guaranty shall be forfeited to the Owner. PERFORMANCE AND PAYMENT BONDS: For any contract exceeding $5,000.00, wording about this requirement must be provided: The contractor shall provide a performance bond and a labor and material payment bond, each in the amount of 100% of the contract price, before the award of the contract. (Sections 756 and757 of the Public School Code of 1949. as amended, and the Public Works Contractors Bond Law of 1967.) Doc note: The State College Area School District will post all construction projects on its website: online . Contractors or interested parties may obtain the Contract Documents by contacting Hoffman Leakey Architects, LLC at 101 N. Spring Street, Bellefonte, PA 16823; phone 814-466-7811. An Electronic version can be obtained, please email Dara Harper dharper@hl-architects.com for a OneDrive link. The drawings and specifications will contain all Bidding Documents.

Post-Bid

Municipal

$695,000.00

Public - City

Renovation

26

23

4

4

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Control, Testing and Inspecting Services, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Progress Cleaning, Commissioning
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Heavy Timber, Finish Carpentry, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Thermal Insulation
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Wood Windows, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Ceilings, Acoustical Ceilings, Flooring, Terrazzo Flooring, Painting and Coating, Painting
Division 12 - Furnishings

Division 12 - Furnishings

Casework, Countertops
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Scaffolding
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Air Distribution, HVAC Ducts and Casings, Air Duct Accessories, Dampers, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Lighting, Interior Lighting
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Electrical Utilities, Utility Substations
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Bulk Material Feeders, Feeders
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Compressors

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
41
Bidding Soon
553
All Active Projects
218
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 3, 2024

September 23, 2024

img_map_placeholder

240 Villa Crest Dr, State College, PA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Panorama Village Renovation: Phase 1

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.