BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 15, 2024 at 7:00 PM

Updated November 16, 2024

Renovation of a detention facility in Ionia, Michigan. Completed plans call for the renovation of a detention facility.

This project consists of the design for a new water filtration and softening system for the Ionia Correctional Facility. The intent is to house the main system in a new outbuilding on the ICF campus, as well as a smaller parallel system at the maintenance building. Currently there is an outdated system located within the facility, this system will be abandoned / removed as part of the new work. This project is being re advertised to include the replacement of a large portion of water main running through several buildings within the campus. ALL questions should be emailed to Jared GavinHelfrich at gavinhelfrichj@michigan.gov address no later than 2:00 p.m., Eastern on Thursday, November 7, 2024.

Post-Bid

Jails / Prisons

$250,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
254
Active Projects
145
Bidding Soon
1,675
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.