BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 25, 2024 at 8:00 PM

Updated September 26, 2024

This is a service / maintenance or supply contract in Chicago, Illinois. Contact the soliciting agency for additional information.

CTA seeks to purchase a base order of six (6) ABLE camera systems, with the option to purchase up to 94 additional ABLE camera systems. The options will be determined by the successful performance of the base order cameras and the expansion of the City of Chicago pilot program. The ABLE camera systems will be placed on CTA's Nova Low Floor Series Diesel Bus and will be installed at CTA South Shops maintenance facility located at 210 W 79th St. Chicago. Under the direction and supervision of CTA, the Contractor will install, operate, manage, and maintain the ABLE camera systems, including any necessary hardware, software, cloud, reporting and communication infrastructure, and provide all associated professional services to operationalize the system and monitor its performance. The contract duration is a base term of 24 months with one option year. PROPOSAL GUARANTEE: NONE Questions regarding this Bid must be submitted via online no later than 4:00 p.m. (CST) Wednesday, August 21, 2024. Questions will not be accepted after this date and time. The right is reserved to accept any proposal or to reject any and all proposals.

Sub-Bidding

Transportation Terminals

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
462
Active Projects
261
Bidding Soon
3,361
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 9, 2024

November 8, 2024

Project location map

210 W 79th St, Chicago, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.