Site work and paving for a road / highway in Aurora, Colorado. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Reference Number 0000360816 The project includes, but is not limited to the supply and installation of the following: Earthwork Site Preparation Protection of Existing Trees Erosion & Sedimentation Control Soil Preparation & Planting Decorative Rock and Aggregate This project will continue the City's efforts to improve medians on arterial streets. The existing medians will be improved with a variety of decorative landscape rock, river boulders and drought-tolerant plants. The plants will be irrigated manually for the first one to three years only. Work not specifically called for, but which must be accomplished to construct the work required under this contract, shall be considered as a part of this contract, whether or not specifically detailed. Question Deadline 09/09/2024 at 5:00 PM MT Questions are submitted online No, Bidders may make written inquiries concerning this ITB to obtain clarification of requirements. Written inquiries shall be emailed to: Angie Young, Senior Procurement Agent, at ayoung@auroragov.org AND Katie Thompson, Project Manager, at kthompso@auroragov.org. Buyer Preferences, Guidelines & Requirements General Requirements - Bid Deposit Required - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % The Contract Documents require that all work be completed within 150 Consecutive Calendar Days plus 10 Consecutive Calendar Days for Mobilization after issuance of the Notice to Proceed. Failure to complete the work as prescribed shall be considered as a Breach of Contract and subject to Liquidated Damages which are $200.00 per day. The estimated cost for this project is from $1,850,000.00 to $2,050,000.00. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The City of Aurora reserves the right to reject any and all Bids, to waive informalities and irregularities, and to accept that bid which is considered to be in the best interest of the City

Post-Bid

Roads / Highways

$2,050,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

15

Subscribe For Documents

74 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Shop Drawings, Product Data, and Samples, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Site Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel
Division 10 - Specialties

Division 10 - Specialties

Other Specialties, Pest Control Devices
Division 27 - Communications

Division 27 - Communications

Communications
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Fill, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Pruning, Watering, Bases, Ballasts, and Paving, Curbs and Gutters, Irrigation, Planting, Plants, Shrubs, Trees, Planting Accessories, Planters
Division 33 - Utilities

Division 33 - Utilities

Fuel Distribution Utilities, Natural-Gas Distribution, Natural-Gas Piping, Hydronic and Steam Energy Utilities, Steam Energy Distribution, Underground Steam and Condensate Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
102
Active Projects
56
Bidding Soon
906
All Active Projects
453
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 19, 2024

November 13, 2024

img_map_placeholder

Multiple Locations, Aurora, CO


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Median Improvements F22/23, C23/24

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.