BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Caldwell, Idaho. Contact the soliciting agency for additional information.

The work involves crushing and stockpiling a total of approximately 195,000 tons of Crushed Aggregate 3/4-inch; 8,000 tons of Cold Mix Recycled Asphalt Pavement (RAP) 3/4-inch; 47,900 tons of Cover Coat Material Class 3 (3/8-inch minus); 10,100 tons of Cover Coat Material Class 4A (1/4-inch minus) and 18,900 tons of 3/4-inch chips and other related work as specified in the Contract Documents, at the following locations: 1} MOJO Gravel Pit on Notus Road (north of Dixie River Road) and 2} Kapicka Gravel Pit on Lincoln Road (between Middleton Road and Midland Blvd.) and 3} Morford Gravel Pit on Pinto Lane (northwest of Pinto Lane Curve) and 4} Galloway Pit on Galloway Road (between Freezeout Rd and Harvey Rd). This is a Highway District No. 4 (HD4) crushing project. It is the intent of these documents to describe the work required to complete this project in sufficient detail to secure comparable bids. All parts or work not specifically mentioned which are necessary in order to provide a complete project shall be included in the bid and shall conform to all Local, State and Federal requirements. In determining the lowest responsive bid, the Owner will consider all acceptable bids on a basis consistent with the bid package. The Owner will also consider whether the bidder is a responsible bidder. Before a contract will be awarded for work contemplated herein, the Owner will conduct such investigation as is necessary to determine the performance record and ability of the apparent low bidder to perform the size and type of work specified under this Contract. Upon request, the bidder shall submit such information as deemed necessary by the Owner to evaluate the bidder's qualifications. Bids must be accompanied by Bid Security in the form of either a bid bond, certified check, cashiers check or cash in the amount of 5% of the amount of the bid proposal. Said bid security shall be forfeited to the Highway District No. 4 as liquidated damages should the successful bidder fail to enter into contract in accordance with their proposal as specified in the Instructions to Bidders. Highway District No. 4 reserves the right to reject any or all proposals, waive any nonmaterial irregularities in the bids received and to accept the proposal deemed most advantageous to the best interest of the Highway District No. 4.

Post-Bid

Roads / Highways

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
5
Bidding Soon
173
All Active Projects
58
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 11, 2024

October 11, 2024

img_map_placeholder

Multiple Locations, Caldwell, ID

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.