Site work and paving for a road / highway in Hood River, Oregon. Completed plans call for site work for a road / highway.

The project location will be: Rand Road, starting on the North side of May Street intersection heading north to the south side of the Sherman street intersection. The project is approximately 1,230 linear feet and 45,150 square feet. The work to be done under this contract consists of the following: 1) Grind out existing asphalt with a 2" grind full width of the road, this will include the removal/disposal of grindings. Compaction of any exposed base material and sweeping of the street after grinding is required. A tack coat is required to be applied before replacement of the new asphalt. 2) . Replacement of the 2" of asphalt will be with a level 2, half inch aggregate dense ACP surface asphalt, PG 64-22 binder asphalt, installed and compacted. After paving is completed, the contractor is required to sand seal all edges where new asphalt meets old asphalt., 3) Replace a 4" yellow paint double center line approximately 2,040 linear feet of 4" yellow paint. 4) The contractor will be responsible for all traffic control involved with this project and conform with ODOT standards. 5)Concrete curb damage that occurs during this project could be required to be replaced. Removal of debris from job site will be required when complete. 6)Project to be completed by September 30, 2024 7)All work is located in Hood River, OR. Prequalification is not required; however, applicant must submit with its Bid evidence of qualifications and experience to perform the work. Bids shall be submitted on the bid forms supplied in the bidding documents and shall be accompanied by a bond, postal money order, certified or cashier's check from the bidder in the amount of at least five percent (5%) of the bid as security. The successful bidder will be required to execute a formal agreement with the Owner and provide acceptable insurance and both a performance bond and material and labor payment bond each in an amount equal to 100% of the contract award in accordance with the Specifications within ten (10) days of Notice of Award. The Owner may reject any Bid not in compliance with prescribed public bidding procedures and requirements, and may reject for good cause any or all bids upon a finding of the Owner that it is in the public interest to do so. The City of Hood River is an equal opportunity employer. The deadline for questions is Thursday, August 28 at 5:00 pm. Questions regarding the project should be submitted via email to r.achziger@cityofhoodriver.gov.

Award

Roads / Highways

$128,466.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
139
Active Projects
78
Bidding Soon
831
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 3, 2024

September 20, 2024

Project location map

N Rand Rd, Hood River, OR

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.