Published December 5, 2024 at 7:00 PM
Updated December 6, 2024
Site work for a civil project in Needville, Texas. Completed plans call for site work for a water / sewer project.
Major items of work include: Construction of two (2) ground storage tanks, two (2) hydrotanks, three (3) booster pumps, and communication to an off-site water well Onsite and Offsite water lines and appurtenances New CMI building Natural gas generator with stand-along fuel tank Electrical and Control System Demolition of existing water plant facilities Question Deadline 10/21/2024 at 12:00 PM CT change from 10/22/2024 No interpretation of the meaning of the drawings, specifications or other bid documents will be made to any bidder orally. All requests for such interpretations must be made in writing addressed to Carl D. McConnell, P.E., Project Engineer, 3014 Avenue I, Rosenberg, Texas 77471, E-mail: cdmcconnell@kaluzainc.com not less than seven (7) calendar days before the Bid opening A bid bond in an amount equal to five percent (5%) of the bid, issued by an acceptable surety, shall be submitted with each bid. A certified check or bank draft payable to City of Needville or negotiable U.S. Government Bonds (as par value) may be submitted in lieu of the Bid Bond. The deadline to ask questions is 8/30/2024 5:00 PM CDT. City of Needville reserves the right to reject any or all bids or to waive any informalities in the bidding. The award will be made to the responsible bidder submitting the lowest acceptable bid. Bids may be held by City of Needville for a period not to exceed sixty (60) days from the date of the bid opening for the purpose of reviewing the bids and investigating the bidder's qualifications prior to the contract award. PROJECT MUST BE SUBSTANTIALLY COMPLETE BY NOVEMBER 1, 2026 Time is of the essence for this contract. The Contractor shall commence work within ten (10) days after the day written notice to do so is given him and shall pursue the work to its completion within the calendar days specified in the Bid Proposal. The study reported herein is an investigation of the subsurface soil conditions at the site of the City of Needville Water Treatment Plant Rehab, Phase I, to be located north of the intersection of F.M. 360 East and Richmond Street in Needville, Fort Bend County, Texas (Key Map 684 W).
Award
Water / Sewer
$2,553,035.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed