BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Cache, Oklahoma. Completed plans call for site work for a water / sewer project.

Drilling Test Hole. Site Address: See Planning Area Map Description: Drilling test hole per specifications Site Directions: Northing: 459700.00 Easting: 1773840.00 On north side of Lee Blvd between Quanah Rd and County HWY 115. 12. Security for Faithful Performance Simultaneously With His Delivery of the Executed Contract, the Contractor Shall Furnish a Performance Bond, Statutory Bond and Maintenance Bond or Bonds, Each in the Amount of 100% of the Contract Price, as Security for Faithful Performance of This Contract and for the Payment of All Persons Performing Labor on the Project Under This Contract and Furnishing Materials in Connection With This Contract, as Specified in the General Conditions Included Herein. The Surety on Such Bond or Bonds Shall Be a Duly Authorized Surety Company Satisfactory to the Owner. 13. Power of Attorney Attorneys-in-fact Who Sign Bid Bonds or Contract Bonds Must File With Each Bond a Certified and Effectively Dated Copy of Their Power of Attorney. 14. Notice of Special Conditions Attention is Particularly Called to Those Parts of the Contract Documents and Specifications Which Deal With the Following: A. Inspection and Testing of Materials B. Insurance Requirements C. Stated Allowances D. Time of Completion 15. Laws and Regulations the Bidder's Attention is Directed to the Fact That All Applicable Federal or State Laws, Municipal Ordinances, and the Rules and Regulations of All Authorities Having Jurisdiction Over Construction of the Project Shall Apply to the Contract Throughout, and They Will Be Deemed to Be Included in the Contract the Same as Though Herein Written Out in Full. 16. Method of Award - Lowest Qualified Bidder if at the Time This Contract is to Be Awarded, the Lowest Base Bid Submitted by a Responsible Bidder Does Not Exceed the Amount of Funds, Then Estimated by the Owner as Available to Finance the Contract, the Contract Will Be Awarded on the Base Bid Only. If Such Bid Exceeds Such Amount, the Owner May Reject All Bids or May Award the Contract on the Base Bid Combined With Such Deductible Alternates Applied in Numerical Order in Which They Are Listed in the Form of Bid, as Produces a Net Amount Which is Within the Available Funds. The Owner Reserves the Right to Reject Any Bid if the Evidence Submitted by, or Investigation of Such Bidder Fails to Satisfy the Owner That Such Bidder is Properly Qualified to Carry Out the Obligations of the Contract and to Complete the Work Contemplated Therein. Conditional Bids Will Not Be Accepted. 7. Bid Security Each Bid Must Be Accompanied by Cash, Certified Check of the Bidder, or a Bond Prepared on the Form of Bid Bond Attached Hereto, Duly Executed by the Bidder as Principal and Having as Surety Thereon a Surety Company Approved by the Owner, in the Amount Not Less Than 5% of the Bid. Such Cash, Check or Bid Bond Will Be Returned, if Requested, to All Except the Three Lowest Bidders Within Three Days After the Opening of Bids, and the Remaining Cash, Check or Bid Bond Will Be Returned, if Requested, Promptly After the Owner and the Accepted Bidder Have Executed the Contract, or if No Award Has Been Made Within 30 Days After the Date of the Opening of Bids, Upon Demand of the Bidder at Any Time Thereafter, as Long as He Has Not Been Notified of the Acceptance of His Bid. 8. Liquidated Damages for Failure to Enter Into Contract the Successful Bidder, Upon His Failure or Refusal to Execute and Deliver the Contract and Bonds Required Within 10 Days After He Has Received Notice of the Acceptance of His Bid, Shall Forfeit to the Owner, as Liquidated Damages for Such Failure or Refusal, the Security Deposit With His Bid. 9. Time of Completion and Liquidation Damages Bidder Must Agree to Commence Work on or Before a Date to Be Specified in a Written "Notice to Proceed" of the Owner and to Fully Complete the Work Within 90 Consecutive Calendar Days Thereafter. 10. Condition of Work Each Bidder Must Inform Himself Fully of the Conditions Relating to the Construction of the Project and the Employment of Labor Thereon. Failure to Do So Will Not Relieve a Successful Bidder of This Obligation to Furnish All Material and Labor Necessary to Carry Out the Provisions of His Contract. Insofar as Possible the Contractor, in Carrying Out His Work, Must Employ Such Methods or Means as Will Not Cause Any Interruption of or Interference With the Work of Any Other Contractor. Any Item Required to Complete the Project to Have a Complete Functional Facility or Required by the Specifications for Which Bid Items Are Not Set Up Shall Be Included in Other Bid Items. All Applicable Laws, Ordinances, and the Rules and Regulations of All Authorities Having Jurisdiction Over Construction of the Project Shall Apply to the Contract Throughout. 2. Preparation of Bid All Forms Included in This Section of These Specifications Except the Agreement, Performance Bond, Maintenance Bond, Statutory Bond, Notice of Award and Notice to Proceed Shall Be Completed and Submitted Intact With the Bid Proposal. Any Bid Submitted Without All Forms Completed Will Be Rejected. Each Bid Must Be Submitted in a Sealed Envelope Bearing on the Outside the Name of the Bidder, His Address, and the Name of the Project for Which the Bid is Submitted. If Forwarded by Mail, the Sealed Envelope Containing the Bid Must Be Enclosed in Another Envelope Addressed as Specified in the Bid Form. A Conditional or Qualified Bid Will Not Be Accepted. 3. Subcontracts the Bidder is Specifically Advised That Any Person, Firm, or Other Party to Whom It is Proposed to Award a Subcontract Under This Contract Shall Be Subject to Acceptance by the Owner. Approval of the Proposed Subcontract Award Will Not Be Given by the Owner Unless and Until the Proposed Subcontractor Has Submitted Certifications and/or Other Evidence Required by the Owner Attesting to the Subcontractors Qualifications. 17. Obligation of Bidder at the Time of the Opening of Bids, Each Bidder Will Be Presumed to Have Inspected the Site and to Have Read and to Be Thoroughly Familiar With the Plans and Contract Documents (Including All Addenda). The Failure or Omission of Any Bidder to Examine Any Form, Instrument or Document Shall in No Way Relieve Any Bidder From Any Obligation in Respect of His Bid. 18. Scope of Contract: the Scope of This Contract is to Drill Test Hole as Shown on the Plans. 4. Telegraphic Modification Any Bidder May Modify His Bid by Telegraphic Communication at Any Time Prior to the Scheduled Closing Time for Receipt of Bids, Provided Such Telegraphic Communication is Received by the Owner Prior to the Closing Time, and Provided Further the Owner is Satisfied That a Written Confirmation of the Telegraphic Modification Over the Signature of the Bidder Was Mailed Prior to the Closing Time. The Telegraphic Communication Should Not Reveal the Bid Price but Should Provide the Addition or Subtraction or Other Modification So That the Final Prices or Terms Will Not Be Known by the Owner Until the Sealed Bid is Opened. Bidders must purchase documents from QuestCDN in order to be eligible to bid.

Award

Water / Sewer

$68,300.00

Public - County

Site Work

3

5

2

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
35
Bidding Soon
371
All Active Projects
160
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 2, 2024

November 1, 2024

img_map_placeholder

SW Lee Blvd, Cache, OK

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.