Site work for a water / sewer project in South Kingstown, Rhode Island. Conceptual plans call for site work for a water / sewer project.
Question Deadline 08/26/2024 at 12:00 PM ET Questions concerning this solicitation must be received by the URI Purchasing Department at URIPurchasing@uri.edu. The University of Rhode Island seeks qualified vendors to submit proposals for the planning, design, permitting, coordination and construction administration support for the rehabilitation of the existing and construction of a new water tank in Kingston, Rhode Island. The location of the existing water tower is off of Flagg Road in Kingston RI, just northeast of the intersection of Flagg Road and Upper College Road. The location of the new water tower is to be determined through this contract. The existing steel water tower has nine support columns and was built in 1971 and is approximately 135 feet tall. The diameter of the ellipsoid tank is 75'. Tank capacity is 1,000,000 gallons. The full tank capacity is at a depth of 35.5 ft in the ellipsoid bowl. Direct access to the tank is through a 30" round roof hatch on top accessed by an internal dry access ladder through the center if the tank. It was repainted in 1998 with an epoxy based coating and a limited exterior painting and structural repairs in 2022. The University has discussed how and when to rehabilitate our existing elevated tank and desire to have a backup water tower constructed somewhere on our Kingston Campus to help service our current and future demands, considering the availability adjacent water supplies, high flow demands for our buildings and other factors. SECTION 3: SCOPE OF WORK AND REQUIREMENTS General Scope of Work Provide design and construction services to facilitate the planning, design, permitting, coordination and construction administration support for the rehabilitation of the existing and construction of a new water tank to include: Section A: Pre-schematic Design 1. Review the University's Water Supply System Management Plan, past water tower studies and as-built plans, and other information related to our existing elevated tank. Review our water distribution hydraulic model and validate critical features such as our well and new water treatment facility production, emergency interconnections, and fire supply pumps at various buildings. Coordinate with Kingston Water District and affirm operating parameters (wells and tanks) of their adjacent water supply system, as well as Kingston Fire District and their plans for continued service to the University community. Consult with the Utilities, Planning & Real Estate, and Capital Projects offices to evaluate the future demands in Kingston and discuss needs and location for an additional water tank. 2. Prepare summary pre-schematic design report that reviews options for the rehabilitation of the existing water supply tank, the locating and size of a potential new water supply tank, and the sequencing of both tanks to minimize costs, impacts to the University and Kingston Water District supplies, and is reasonably implementable within a 5-year period. Section B: Final Design 1. Schematic Design (SD) Phase a. Class 1 Boundary Survey (including wetlands flagging, both existing tank as well as new tank) b. Utility Survey c. Topographical Survey d. Advance pre-schematic design concepts for both tanks in plan view to SD detail e. Preliminary coordination with RIDOH, RIDEM and all effected utilities (including telecom utilities on the existing tank) f. Prepare SD construction engineers estimate, and external 3rd party estimate of costs g. Facilitate value engineering session with Owner to confirm final scope 2. 3. Design Development (DD) Phase a. Advance SD plans to DD phase within budget constraints b. Finalize site and coordination details including all site clearing and preparation, utility coordination, color selection and potential branding, security for the site and towers, etc., c. Complete RIDOH, RIDEM, FCC and FAA (as required), State Fire Marshal and State Building Code Commission permitting Construction Document (CD) Phase a. Advance DD plans and contract documents to CD phase b. Prepare CD Estimate based on final design, using 3rd party independent estimate 4. Contract Administration (CA) Phase a. Bidding support b. Weekly emails & misc. correspondence c. Biweekly site meetings d. Change order management e. Project completion certification
Conceptual
Water / Sewer
$4,477,000.00
Public - State/Provincial
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 16, 2025
To Be Determined, South Kingstown, RI
Related To This Project
South Kingstown, RI
Bid Date: Sep 06 2024
South Kingstown, RI
Bid Date: Sep 17 2024
South Kingstown, RI
--
South Kingstown, RI
--
South Kingstown, RI
Bid Date: Oct 18 2024
South Kingstown, RI
Bid Date: Oct 18 2024
South Kingstown, RI
--
South Kingstown, RI
--
South Kingstown, RI
Bid Date: Jun 04 2019
South Kingstown, RI
Bid Date: Aug 27 2024
South Kingstown, RI
Bid Date: Aug 30 2024
South Kingstown, RI
Bid Date: Aug 29 2024
South Kingstown, RI
--
South Kingstown, RI
--
South Kingstown, RI
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.