BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Boston, Massachusetts. Completed plans call for the renovation of a municipal facility.

The work includes renovation to repair existing flooring and wall Partitions due to flood damage in the first-floor corridors; Renovation of the existing office suite, fire rescue suite, restroom, Kitchenette, and conference room. The project involves the interior Demolition of partitions and finishes; new partitions, ceilings, Finishes, mep/fp systems, and accessories will be provided to support The new spaces at logan office center A proposal guaranty shall be submitted with each General Bid consisting of a bid deposit for five (5) percent of the value of the bid; when sub-bids are required, each must be accompanied by a deposit equal to five (5) percent of the sub-bid amount in the form of a bid bond in the name of which the Contract for the work is to be executed. The bid deposit shall be (a) in a form satisfactory to the Authority, (b) with a surety company qualified to do business in the Commonwealth and satisfactory to the Authority, and (c) conditioned upon the faithful performance by the principal of the agreements contained in the bid. The successful Bidder will be required to furnish a performance bond and a labor and materials payment bond, each in an amount equal to 100% of the Contract price. The surety shall be a surety company or securities satisfactory to the Authority. Attention is called to the minimum rate of wages to be paid on the work as determined under the provisions of Chapter 149, Massachusetts General Laws, Section 26 to 27G, inclusive, as amended. The Contractor will be required to pay minimum wages in accordance with the schedules listed in Division II, Special Provisions of the Specifications, which wage rates have been predetermined by the U. S. Secretary of Labor and /or the Massachusetts Department of Labor Standards, whichever is greater The successful Bidder will be required to purchase and maintain Bodily Injury Liability Insurance and Property Damage Liability Insurance for a combined single limit of $1,000,000 (ONE MILLION DOLLARS). Said policy shall be on an occurrence basis and the Authority shall be included as an Additional Insured. See the insurance sections of Division I, General Requirements and Division II, Special Provisions for complete details This contract is subject to a Minority/Women Owned Business Enterprise participation provision requiring that not less than 5.1% of the Contract be performed by minority and women owned business enterprise contractors. With respect to this provision, bidders are urged to familiarize themselves thoroughly with the Bidding Documents. Strict compliance with the pertinent procedures will be required for a bidder to be deemed responsive and eligible. The Authority reserves the right to reject any sub-bid of any sub-trade where permitted by Section 44E of the above-referenced General Laws. The right is also reserved to waive any informality in or to reject any or all proposals and General Bids. Work Included: Provide labor, materials and equipment necessary to complete the work of this Section, including but not limited to the following: 1. The preparation and implementation of a Contractor's Health and Safety Plan when there is a potential for employees, the general public or the environment to be exposed to contaminated soil or groundwater. The HASP shall address all activities performed within the Contract including but not limited to soil excavation, dewatering and stockpile management. 2. The Contractor shall develop a detailed HASP using this Section and the site inspection as a basis for delineating additional details and requirements as the Contractor determines necessary. The HASP must detail the protocols necessary for protecting workers, on-site personnel, visitors and potential off-site receptors from potential hazards related to hazardous materials encountered during stockpiling, removing and handling of potentially contaminated soils and groundwater. Question Deadline 09/02/2024 Any inquires by bidders as to interpretations of the Drawings, Specifications, Special Provisions, or other Contract Documents must be submitted to CPBidQuestions@massport.com with the MPA Project Number referenced in the subject line, not later than seven (7) days before the advertised date for submission.

Post-Bid

Municipal

$1,074,983.00

Public - State/Provincial

Renovation

67

29

10

5

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
345
Active Projects
223
Bidding Soon
2,630
All Active Projects
1,211
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 11, 2024

November 1, 2024

img_map_placeholder

1 Harborside Dr, Boston, MA


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.