BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Remodeling of a fire / police facility in Doral, Florida. Completed plans call for the remodel of a fire / police facility.

ESTIMATED COST: $500,000.00 LICENSE REQUIREMENT: General Building Contractor The work, in general consist of One entire Project divided in to 3 Phases - Contractor is required to include in project estimate cost the rental fees of (2) FortsUSA space (20'x20') for the entire project duration to accommodate MDFR Fire Station staff during construction. Phase 1 consists of complete ADA Bathroom/Battalion Dorm remodeling. The new Dorm/ Bathroom area remodeling inclusive of demolition, fabrication and installation of new partition walls, new doors, & flooring etc. inclusive of new Plumbing, Electrical, Mechanical and Fire Sprinkler work as mentioned and described herein noted on the Project contract drawings FS #45 - Bath & Dorm Plans Phase 1 consisting of six (6) Sheets D-1.0, A-1.0, A-3.0, E-1.0, P-1.0, and FP-1.0. The contractor shall protect active Fire Station with proper visqueen or construction material, for dust & noise protection/control, for each of the Project Phases. Phase 2 consists of complete Kitchen remodeling as mentioned above. The proposed Interior Kitchen space will be totally remodeled to receive a complete makeover with new Terrazo flooring & baseboard, Electrical, Plumbing, Mechanical components as well as (16 Ga.) Stainless Steel cabinets, counter tops and backsplash full height inclusive of New Kitchen equipment's & appliances as mentioned and described herein noted on the project contract drawings FS #45 - Kitchen Phase 2 consisting of four (4) Sheets D-2.0, A-2.0, A-3.1 and MEP-2.0. The contractor shall protect active Fire Station with proper visqueen or construction material, for dust & noise protection/control, for each of the Project Phases. During this project phase, MDFR will provide usage of temporary movable kitchen for station use. Phase 3 consist of the removal and disposal of existing floor tiles & baseboard, located in the Lobby area, interior corridor and dining/day room to be replaced with new Terrazo flooring and baseboard. FS #45 - Flooring Phase 3 consisting of one (1) Sheet A-3.2. prepared in-house by MDFR-Miami-Dade Fire Rescue, Design & Construction Division. The project Station is located at 9710 NW 58th Street, Fl. 33178. This project is covered under the Cone of Silence. Any questions pertaining to this project must be submitted in writing to the Project Manager. Please email all questions to: ALBERTO. PERDIGON@miamidade.gov. and BENEDIT@miamidade.gov, coping the Clerks of the Board at CLERKBCC@miamidade.gov. Question Deadline 09/05/2024 at 5:00 PM ET

GC Bidding

Fire / Police

$500,000.00

Public - County

Remodeling

13

3

2

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
45
Bidding Soon
1,102
All Active Projects
491
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 5, 2024

December 16, 2024

img_map_placeholder

9710 NW 58th St, Doral, FL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.