BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Grand Forks, North Dakota. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Construction of N 3rd & N 4th St Alley Reconstruct (2nd Ave N to University Ave), Project. The Work, if Awarded, Shall Be Completed by November 1, 2024 . Bidder Must Be Licensed for the Full Amount of the Bid. No Bid Will Be Read or Considered Which Does Not Fully Comply With the Above Provisions as to Bond and License. The City Council Reserves the Right to Reject Any or All Bids and/or to Waive Any Informality in the Bids Received and to Accept Any Bid Deemed to Be Most Favorable to the Interest of the City of Grand Forks. Project Scope of Work Includes the Following Approximate Quantities: 670 Sy - 6" Concrete Pavement, 115 Cy - Aggregate Base, 50 Sy - Concrete Sidewalk, and Other Miscellaneous Work Items. Each Bid Must Have a Pdf Document (Uploaded to Quest Virtubid) Which Contains an Acceptable Bidder's Bond in a Sum Equal to Five Percent of the Full Amount of the Bid, Executed by the Bidder as Principal and by a Surety, Conditioned That if the Principal's Bid Be Accepted and the Contract Awarded to the Principal, the Principal, Within Ten Days After Notice of Award, Will Execute a Contract in Accordance With the Term of the Bid and a Contractor's Bond as Required by Law and the Regulations and Determinations of the Grand Forks City Council. Each Bid Shall Also Contain a Pdf Document (Uploaded to Quest Virtubid) of the License or Certificate of Renewal Thereof Issued by the Secretary of State Which Will Be Uploaded. Contractor will not be entitled to any compensation for causes resulting in delays or hindrances to the work. Extensions of time will be granted for unavoidable delays, which in the opinion of Engineer are clearly beyond the control of Contractor, including but not restricted to acts of God, or the public enemy, acts of the Owner, acts of another contractor in the performance of a contract with the Owner, fires, floods, epidemics, quarantine restrictions, strikes and freight embargoes. Engineer must receive a written request for time extension from Contractor not more than 20 days after commencement of delay before any time extension will be considered. Requests made beyond the 20-day limit will be cause for denial. Any extension of time will not relieve Contractor or his sureties from their obligations which shall remain in full force and effect until the satisfactory discharge of the contract.

Award

Roads / Highways

$179,472.00

Public - City

Paving, Site Work

15

4

6

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
14
Bidding Soon
91
All Active Projects
46
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 5, 2024

October 25, 2024

img_map_placeholder

Multiple Locations, Grand Forks, ND

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.