Site work and new construction of a medical facility in San Diego, California. Completed plans call for the construction of a 135,000-square-foot, five-story above grade medical facility; and for site work for a medical facility.
Bid Package 016050 SDG&E Undergrounding & Electrical Substation Pre-Purchase Estimated construction cost $1,500,000 C-10 License The University has bid and been awarded a CM at Risk Contract to DPR Construction (hereafter "CM/Contractor"). CM/Contractor is responsible for bidding and awarding all subsequent subcontractor packages, including this package. Project Information -The Multipurpose Clinical Research Building is an approximately 135,000 SF new construction of a 5 story multi-tenant building at the Hillcrest Medical Center for UC San Diego Health System. Tenant spaces include Childcare, Retail/Dining, Clinical Research and Office. The Project site is located at the intersection of First Ave and Arbor Drive. Project duration is estimated to be 22 months, commencing in August 2025 and concluding in June 2027. Early work to underground SDG&E overhead power line will take place in the first quarter of 2025. The estimated construction cost of the project is $116,000,000.00 Scope of work to include undergrounding of existing SDG&E - trench/backfill, asphalt sawcut/patch, conduit installation, traffic control (including permits, trench plates (if needed), to the SDG&E guidelines. Scope will also include the purchase of (2) medium voltage substations for the MCR building. (Note - the building electrical work will be bid at a later date). Every effort will be made to ensure that all persons have equal access to contracts and other business opportunities with the University within the limits imposed by law or University policy. Each Bidder may be required to show evidence of its equal employment opportunity policy. The successful Bidder and its subcontractors will be required to follow the nondiscrimination requirements set forth in the Bidding Documents and to pay prevailing wage at the location of the work. In addition, the University is committed to promoting and increasing participation of small business enterprises (SBEs) and disabled veteran business enterprises (DVBEs) relating to all goods and services covered under the awarded agreement, subject to any and all applicable obligations under state and federal law, and University policies. The awarded contractor shall make best efforts to provide qualified SBEs and DVBEs with the maximum opportunity to participate. Potential bidders will be required to submit their small business outreach plan to the University as part of the prequalification process. The work described in the contract is a public work subject to section 1771 of the California Labor Code. ALL CONTRACTORS AND SUBCONTRACTORS MUST BE REGISTERED WITH THE DEPARTMENT OF INDUSTRIAL RELATIONS (DIR) AT BID TIME. No contractor or subcontractor, regardless of tier, may be listed on a Bid for, or engage in the performance of, any portion of this project, unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 and 1771.1. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. The successful Bidder shall pay all persons providing construction services and/or any labor on site, including any University location, no less than the UC Fair Wage (defined as $15 per hour) and shall comply with all applicable federal, state and local working condition requirements. The Multipurpose Clinical Research Building is an approximately 135,000 SF new construction of a 5 story multi-tenant building at the Hillcrest Medical Center for UC San Diego Health System. Tenant spaces include Childcare, Retail/Dining, Clinical Research and Office. The Project site is located at the intersection of First Ave and Arbor Drive. Project duration is estimated to be 22 months, commencing in August 2025 and concluding in June 2027. Early work to underground SDG&E overhead power line will take place in the first quarter of 2025. Question- Wednesday, September 25, 2024 @ 4:00 PM
Post-Bid
Medical
$116,000,000.00
Public - State/Provincial
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 2, 2024
August 1, 2025
First Ave and Arbor Drive, San Diego, CA
Related To This Project
San Diego, CA
Bid Date: Sep 12 2024
San Diego, CA
--
San Diego, CA
Bid Date: Sep 27 2024
San Diego, CA
Bid Date: Sep 11 2024
San Diego, CA
Bid Date: Sep 27 2024
San Diego, CA
Bid Date: Sep 06 2024
San Diego, CA
Bid Date: Sep 13 2024
San Diego, CA
--
San Diego, CA
Bid Date: Sep 26 2024
San Diego, CA
--
San Diego, CA
Bid Date: Sep 06 2024
San Diego, CA
--
San Diego, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.