Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a detention facility in Appleton, Wisconsin. Completed plans call for the renovation of a detention facility.
Bids must remain firm once submitted and may not be withdrawn for a period of sixty days, subject to provisions for correction of errors in the bid as contained in &66.0901, Wisconsin Statutes, Outagamie County Ordinance, and Administrative Rules. Question Deadline 09/10/2024 at 5:00 PM CT The deadline to ask questions Project Description 1.9.1 The Premise Distribution System shall include the horizontal cables, the telecommunications outlets/connectors in the work area, the patch panels in the MDF and IDF closets, patch cords located in the MDF/IDF closets, patch cords located at the telecommunications outlet/connector in the work area. 1.9.2 The horizontal cabling system shall accommodate future equipment and service changes. 1.9.3 The horizontal cabling system is a star topology. Each work area telecommunications outlet/connector as shown in the drawings shall be connected to a patch panel in the telecommunications closet. 1.9.4 Justice Center Level 3 have a telecommunications closet as indicated by the drawings. 1.9.5 Separation of horizontal cabling pathways from typical sources of EMI shall be adhered to as per EIA/TIA standards. 1.9.6 Bridged taps and splices shall not be permitted as part of the horizontal cabling system. 1.9.7 The maximum horizontal distance shall be 90 m (295ft), independent of media type. This cable length shall be from the mechanical termination of the media at the horizontal cross-connect in the telecommunications closet to the telecommunications outlet/connector in the work area. 1.9.8 Patch cords in the cross-connect facilities that connect horizontal cabling with equipment or backbone cabling shall not exceed 6 meters (20ft) in length. 2 1.9.9 All data horizontal cabling shall be plenum four pair UTP cable with a white jacket, spec for Panduit s Category 6 (TX6000) system. There shall be no exceptions or alternatives accepted. Approved unshielded cable manufacturer for horizontal data cable: Panduit PUP6004WH-WLPZ (White Jacket) for Plenum spaces. 1.9.10 All horizontal cabling shall be physically supported in accordance with the latest revision of the EIA/TIA category 6 and 568 standards. 1.9.11 All horizontal cabling that is installed in secure areas shall be supported via j-hook type supports at a minimum of 4 feet apart for all ceiling areas where conduit or cable tray is unavailable. A secure area is defined as an area that can only be accessed through security ceiling doors. All horizontal cabling that is installed outside of secure areas must be supported in rigid conduit. 1.9.12 Installation shall occur in one building - Justice Center Levels Ground floor and 2 nd Floor. 1.9.13 No drilling or any activity that causes sound to be heard in courtrooms shall occur during Outagamie County Courtroom Proceedings. Proceedings occur Monday through Friday usually from 8:00 am to 5:00 pm. 1.9.14 Any furniture that must be moved, for the installation of the Premise Distribution System, is the responsibility of the contractor. The contractor shall see that any moved furniture shall be moved back into place after the installation is complete.
Award
Jails / Prisons
$50,000.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 17, 2024
October 17, 2024
320 S Walnut St, Appleton, WI
Related To This Project
Appleton, WI
Bid Date: Oct 01 2024
Appleton, WI
Bid Date: Sep 25 2024
Appleton, WI
Bid Date: Sep 27 2024
Appleton, WI
Bid Date: Sep 24 2024
Appleton, WI
Bid Date: Oct 18 2024
Appleton, WI
Bid Date: Oct 24 2024
Appleton, WI
Bid Date: Nov 04 2024
Appleton, WI
Bid Date: Oct 29 2024
Appleton, WI
Bid Date: Sep 04 2024
Appleton, WI
Bid Date: Sep 26 2024
Appleton, WI
Bid Date: Aug 26 2024
Appleton, WI
Bid Date: Aug 29 2024
Appleton, WI
Bid Date: Aug 22 2024
Appleton, WI
--
Appleton, WI
Bid Date: Aug 14 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.