BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Reno, Nevada. Completed plans call for site work for a water / sewer project.

Said Proposal shall include all labor, tools, implements, machinery, materials, and any incidentals necessary to complete the work in the manner and time prescribed, and in strict conformity with the Contract Documents to the satisfaction of the City Engineer. In general, the major work items include: Excavation, installation of HDPE liner and underdrain system, placement of cover soil, restoration of historic stone walls, construction of concrete liner attachment, traffic control, and public relations activities, and other miscellaneous work as outlined in the plans and specifications. Minority and Women Business Enterprises will be afforded full opportunity to submit bids in response to this notice, and will not be discriminated against on the grounds of race, color, or national origin in consideration for and award of any contract entered into pursuant to this advertisement. The City of Reno affirms its interest in and encourages the different contracting communities to actively pursue participation and utilization of Minority and Women Business Enterprises on City projects. The proposed contract is under and subject to Executive Order 11246 of September 24, 1965, and to the Equal Employment Opportunity (EEO) and Labor Standard Provisions. Minimum Wage rates have been determined by the Labor Commissioner of the State of Nevada and are set forth in the contract documents. In no case shall the wage rates be less than prescribed therein. The bidder must supply all the information required by the bid documents and specifications and complete all forms in the Proposal, including, but not limited to the Section 3 Clause, Suspension and Debarment Certificate, Prime Contractors Agreement of Compliance, and Bidders Statement on Previous Contracts Subject to EEO Clause. The EEO requirements, labor provisions, and wage rates are included in the specifications and bid documents. The Bidders attention is directed to Nevada Revised Statutes 338.01165 setting forth the requirements for the use of apprentices on public works which requires a contractor or subcontractor to comply with certain requirements relating to the use of apprentices on public works. Type of Award Lump Sum Liquidated Damages 1000 Estimated Bid Value $1.5M Start/Delivery Date 11/18/2024 Project Duration 180 Calendar Days Bid Bond 5.00% Payment Bond 100.00% Performance Bond 100.00% Pre-Bid Meeting: No Question Deadline 09/06/2024 at 5:00 PM PT Online Q&A: Yes

Award

Water / Sewer

$1,489,174.00

Public - City

Site Work

20

15

10

5

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
34
Active Projects
16
Bidding Soon
266
All Active Projects
108
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 17, 2024

November 18, 2024

img_map_placeholder

2055 Idlewild Dr, Reno, NV

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.