BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Milton, Florida. Completed plans call for site work for a development.

The Project consists of the following: Construction of a wastewater effluent disposal system that includes a 2 MG ground storage tank, pump station, a ined 4 MG reclaimed storage pond, effluent pipeline (including valves and fittings), and two (2) spray irrigation effluent disposal sites. Full documents and description may be obtained a the City of Milton website at online. Bid Documents may be examined only at: Milton City Hall, 6738 Dixon Street, Milton, Florida 32570 Monday Friday between 7:30 A.M. thru 4:30 PM. CST Questions should be submitted in writing and directed to the Purchasing Department at (850) 983 - 5480; or by e-mail to mwilliams@miltonfl.org by Monday, September 9, 2024, at 2:00 p.m. Answers will be posted by Thursday, September 12, 2024, at 2:00 p.m. CST) Please be advised that the City Council reserves the right to accept the best submission for the city or reject all submissions. Issuing Office for the Bid Documents is: Baskerville-Donovan, Inc., 449 West Main Street, Pensacola, FL, 32502 Contact Richard Delp at 850-438-9661 or rdelp@baskerville-donovan.com Monday - Friday 8:00 a.m. thru 4:00 p.m. CST Prospective Bidders may examine and/or purchase the Bid Documents at the Issuing Office. Bid Documents are available on compact disc (as portable document format (PDF) files) for a nonrefundable charge of $50.00, including shipping via overnight express service. Partial sets of Bid Documents will not be available from the Issuing Office. SCOPE A. This scope covers the furnishing, installation, testing, adjusting and placing in operation all electrical equipment, devices, facilities, materials, and auxiliary items necessary for the complete and successful operation of all electrical equipment as herein described, shown on the plans, or deemed necessary for the completion of the electrical portion of the project. It is the intent of DIVISION 16 to outline the electrical requirements of the contract in order to provide the information necessary for the construction of a fully operational system as shown on the plans and as herein described. A comprehensive electrical scope of work is as follows: 1. Power/Electrical System 2. Lighting System 3. Control System 4. Instrumentation 5. Utility Work 6. Connection of Electrically Powered Mechanical Equipment 7. Temporary Construction Power 8. All Incidentals Necessary for a Complete and Fully Operational Electrical System.

Bid Results

Water / Sewer

$17,217,059.00

Public - City

Site Work

69

26

91

5

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
29
Bidding Soon
479
All Active Projects
218
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 25, 2024

November 25, 2024

img_map_placeholder

To Be Determined, Milton, FL

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.