Published October 17, 2024 at 8:00 PM

Updated October 1, 2024

Site work for a civil project in Milton, Florida. Completed plans call for site work for a development.

The Project consists of the following: Construction of a wastewater effluent disposal system that includes a 2 MG ground storage tank, pump station, a ined 4 MG reclaimed storage pond, effluent pipeline (including valves and fittings), and two (2) spray irrigation effluent disposal sites. Full documents and description may be obtained a the City of Milton website at online. Bid Documents may be examined only at: Milton City Hall, 6738 Dixon Street, Milton, Florida 32570 Monday Friday between 7:30 A.M. thru 4:30 PM. CST Questions should be submitted in writing and directed to the Purchasing Department at (850) 983 - 5480; or by e-mail to mwilliams@miltonfl.org by Monday, September 9, 2024, at 2:00 p.m. Answers will be posted by Thursday, September 12, 2024, at 2:00 p.m. CST) Please be advised that the City Council reserves the right to accept the best submission for the city or reject all submissions. Issuing Office for the Bid Documents is: Baskerville-Donovan, Inc., 449 West Main Street, Pensacola, FL, 32502 Contact Richard Delp at 850-438-9661 or rdelp@baskerville-donovan.com Monday - Friday 8:00 a.m. thru 4:00 p.m. CST Prospective Bidders may examine and/or purchase the Bid Documents at the Issuing Office. Bid Documents are available on compact disc (as portable document format (PDF) files) for a nonrefundable charge of $50.00, including shipping via overnight express service. Partial sets of Bid Documents will not be available from the Issuing Office. SCOPE A. This scope covers the furnishing, installation, testing, adjusting and placing in operation all electrical equipment, devices, facilities, materials, and auxiliary items necessary for the complete and successful operation of all electrical equipment as herein described, shown on the plans, or deemed necessary for the completion of the electrical portion of the project. It is the intent of DIVISION 16 to outline the electrical requirements of the contract in order to provide the information necessary for the construction of a fully operational system as shown on the plans and as herein described. A comprehensive electrical scope of work is as follows: 1. Power/Electrical System 2. Lighting System 3. Control System 4. Instrumentation 5. Utility Work 6. Connection of Electrically Powered Mechanical Equipment 7. Temporary Construction Power 8. All Incidentals Necessary for a Complete and Fully Operational Electrical System.

Bid Results

Water / Sewer

$17,217,059.00

Public - City

Site Work

69

26

91

5

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Temporary Utilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Spare Parts, Extra Stock Materials, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Specialty Placed Concrete, Precast Concrete, Precast Structural Concrete
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Architectural Woodwork
Division 09 - Finishes

Division 09 - Finishes

Tiling, Quarry Tiling, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Furnishing Accessories, Bowls
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, Instrumentation and Control for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Electrical and Cathodic Protection, Facility Lightning Protection
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Shoring and Underpinning, Vibroflotation and Densification, Densification
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Fertilizing, Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Irrigation, Planting, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Utility Structures, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Hoists, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
31
Bidding Soon
486
All Active Projects
260
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 25, 2024

November 25, 2024

img_map_placeholder

To Be Determined, Milton, FL

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Effluent Disposal System and Sprayfields 1 & 2

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.