BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of an educational facility in Bakersfield, California. Completed plans call for the construction of a 13,000-square-foot educational facility; and for site work for a educational facility.

Project Identification Name: District Office Modular Building Project Overview: Fairfax School District is in the process of adding roughly 13,000 square feet of District Office Modular Building space to undeveloped parcel West of the Zephyr Lane Elementary School. The building will be constructed using a slab-ongrade permanent modular construction building system. The building is identified on the attached drawing sheets as New District Office. These drawings are of a schematic design in nature - it is expected that the selected modular company shall prepare appropriate drawings to complete the plans and submit to the California Department of Housing and Community Development (HCD) and the County of Kern for review. Project Location: 6327 Zephyr Lane, Bakersfield, CA 93307 Project Description: Refer to Request for Proposal for full description. This project is anticipated to start on approximately 09/26/2024 and have a duration of five (5) calendar months for drawing completion and HCD and County approval of plans and eight (8) calendar months for construction and delivery of buildings to site. This project is anticipated to start on approximately 10/10/2024 [date] and is anticipated to have a duration of 400 calendar days for completion. Each bid shall be accompanied by a bid security in cash, a certified or cashier's check, or bid bond in an amount not less than 10 percent of the total bid price payable to the Owner. The Construction Agreement and the form of the Payment and Performance Bonds which the successful bidder as Contractor will be required to execute are included in the Contract Documents and should be carefully examined by the bidder. The Payment Bond shall be in an amount not less than 100 percent of the amount of the contract in accordance with Civil Code section 9554. The successful bidder as Contractor will also be required to furnish a separate Performance Bond in the amount of 100 percent of the contract amount. Sufficient bonds shall be fully executed and returned to Owner with the executed Construction Agreement. Question Deadline 09/09/2024 at 2:00 PM PT All questions must be received by Ordiz-Melby Architects, Inc. Attn.: Manuel Maldonado [jmaldonado@ordizmelby.com], Alyssa Grishaber [agrishaber@ordizmelby.com] and Charlene Perry [cperry@ordizmelby.com] in written form via email. This will allow time to respond to the question and/or issue an addendum to all contractors addressing the question. Questions received after this date will not be acknowledged. Award of Contract. (a) The Owner reserves the right to reject any or all bids, or to waive any irregularities or informalities in any bids or in the bidding process, and to award more than one contract. If two identical low bids are received from responsive and responsible bidders, the Owner will determine which bid will be accepted pursuant to Public Contract Code Section 20117. (b) If made by the Owner, award of the contract will be by action of the governing board or other governing body to the lowest responsive and responsible bidder. In the event an award of the contract is made to a bidder and that bidder fails or refuses to execute the Agreement and provide the required documents within the time required, the Owner may award the contract to the next lowest responsive and responsible bidder or release all bidders. An election by the Owner to reject all bids does not release the bid security of any bidder who has previously been awarded the contract and failed or refused to execute the Agreement and provide the required documents. (c) In ascertaining the low bidder, the bids will be examined without reference to any substitutions requested by any bidder, whether or not the substitution request would result in a modification of the contract price. The Owner reserves the right to reject the bid of any bidder who does not pass any such evaluation to the satisfaction of the Owner, or in the Owner's sole discretion, to permit substitution of subcontractor(s) found non-responsible. Bid Clarifications and Bid RFIs should be submitted to the following location and contact: Location: Ordiz-Melby Architects, Inc. 5500 Ming Avenue, Suite 280 Bakersfield, CA 93309 Contact: Manuel Maldonado - Principal jmaldonado@ordizmelby.com Alyssa Grishaber - Project Architect agrishaber@ordizmelby.com Charlene Perry - Project Administrator cperry@ordizmelby.com Completed Proposals should be submitted to the District Representative at the following location and contact: District Representative: Location: Fairfax School District District Office 1500 S Fairfax Road Bakersfield, CA 93307 Contact: David Mack - Chief Administrator of Business (661) 366-7221 dmack@fairfaxsd.us

Post-Bid

Educational

$7,000,000.00

Public - City

New Construction, Site Work

15

8

6

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
95
Active Projects
49
Bidding Soon
823
All Active Projects
364
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 19, 2024

October 10, 2024

November 14, 2025

img_map_placeholder

6327 Zephyr Ln, Bakersfield, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.