Published November 13, 2024 at 7:00 PM

Updated October 1, 2024

Site work for a civil project in Fairfield, Connecticut. Completed plans call for site work for a water / sewer project.

The Town of Fairfield (Town) on behalf of its Department of Public Works (DPW) is seeking competitive bids from qualified Contractors to provide all labor, materials, equipment, and all else necessary for flood mitigation at 150 Villa Avenue, Fairfield, CT. The purpose of the project is to address many neighborhood complaints and reduce flooding potential within the Rooster River watershed. In most cases, holding back storm water runoff through detention reduces the flow rate and reduces the amount of flooding for areas downstream and should benefit most of the properties and homeowners. A five (5) percent bid bond or equal approved security as stated per the Terms and Conditions must be submitted with the proposal. Question Deadline 08/30/2024 at 4:30 PM ET Written requests for information will not be accepted after. Questions concerning this bid must be submitted in writing and directed only to:Ms. Lee A. Flaherty, Assistant Director LFlaherty@fairfieldct.org All bonds, including payment and performance bonds when applicable, shall be written by a surety company or companies licensed to issue bonds in the State of Connecticut, and shall have at least an A-VII policy holders rating, as reported by A.M. Best Rating Services, or otherwise deemed acceptable by the Town. The Town always reserves the right to reject surety companies, if an approved surety bond cannot be provided the bidder shall be deemed non-responsive. The goal of this flood mitigation project is to reduce the amount of flooding, reduce the frequency of flooding, reduce property damage, improve access, and improve water quality.

Bid Results

Water / Sewer

$856,000.00

Public - City

Site Work

14

14

28

3

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Controls, Temporary Erosion and Sediment Control, Execution and Closeout Requirements, Examination and Preparation, Execution
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Site Demolition
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 26 - Electrical

Division 26 - Electrical

Lighting, Exterior Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Wetlands, Constructed Wetlands, Planting, Planting Preparation, Soil Preparation, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Storm Drainage Utilities, Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
537
Active Projects
319
Bidding Soon
4,765
All Active Projects
2,173
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 17, 2024

November 18, 2024

img_map_placeholder

150 Villa Ave, Fairfield, CT


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Rooster River Flood Mitigation Project at 150 Villa Avenue

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.