BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Rockford, Michigan. Completed plans call for site work for a water / sewer project.

The project consists of furnishing all material and constructing improvements to Pinehurst Lift Station, including the following: Two (2) pumps, 4-inch piping and valves, air release manhole, 6-inch bypass connection, control panel and pad, and precast structure lids. All associated demolition, equipment, electrical, instrumentation, controls, bypass operation, site work, and restoration. The work to be performed under this contract will be paid for with local funds. Question Deadline 09/12/2024 The Owner reserves the right to reject any or all bids and to waive any irregularities in bidding. No bid may be withdrawn after the scheduled closing time for receiving bids for at least one hundred twenty (120) days thereafter. Construction activities are to begin as soon as possible following contract award. It is the intent of the Owner to consider award of the contract to the successful bidder at the September 23,2024, Township Board Meeting. The work covered by the Contract Documents consists of improvements to Pinehurst Lift Station, located at 7041 Pinehurst Lane, Rockford, MI 49341. Included in this work is furnishing all supervision, labor, materials, equipment, activities and related costs necessary for completing the improvements. The project consists of furnishing all material and constructing improvements to Pinehurst Lift Station, including the following: Two (2) pumps, 4-inch piping and valves, air release manhole, 6-inch bypass connection, control panel and pad, and precast structure All associated demolition, equipment, electrical, instrumentation, controls, bypass operation, site work, and restoration. B. The Contractor must visit the site of the work and must completely inform himself relative to construction hazards and procedure, labor, and all other conditions and factors, local and otherwise, which would affect execution and completion of the work and its cost. Such considerations must include the arrangement and condition of the existing structures and facilities, the availability and cost of labor and facilities for transportation, handling and storage of materials and equipment. All such factors must be properly investigated and considered in the preparation of the Contractor's proposal. There will be no subsequent financial adjustment for lack of such prior information. C. The Contractor must guarantee all equipment and work for one year from the date of substantial completion.

Award

Water / Sewer

$521,750.00

Public - City

Site Work

14

31

6

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
42
Bidding Soon
603
All Active Projects
251
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 17, 2024

September 23, 2024

img_map_placeholder

7041 Pinehurst Ln NE, Rockford, MI


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.