Site work for a water / sewer project in Pembina, North Dakota. Completed plans call for site work for a water / sewer project.

This contract is for the removal of existing sheet piling. The work required consists of removal of existing sheet piling at Outfall A along the Pembina River in Pembina, North Dakota. Work includes accessing the project area, cutting or pulling of existing sheet piling at ground surface, disposal of excess sheet piling, and site restoration in areas disturbed by the Contractor's operations. Site visits are encouraged by potential offerors. Reference "Pembina Repairs_Attachment A" for project limits when accessing the sheet pile removal location. Any questions can be directed to Roberta L. Just at roberta.l.justusace.army.mil. The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than: Complete all work by 30 March 2025. Questions - All questions concerning the solicitation document shall be submitted no later than COB September 3, 2024 via email to roberta.l.justusace.army.mil. Answers to questions will be provided to all quoters being solicited though an amendment, giving due regard to the proper protection of proprietary information. The magnitude of this requirement is betw een $25 thousand and $100 thousand . *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Contractor shall complete all work in this section in a complete and acceptable manner. 9.1 Work Limits: All work shall be conducted within the work limits shown in Attachment A. Approval by the Contracting Officer is required before any work can be conducted outside of the work limits. 9.2 Erosion prevention: Prior to work commencement, furnish and install temporary erosion protection features in accordance with all permits to prevent loss of topsoil or any other exposed soils resulting from the work of this contract.

Award

Water / Sewer

$32,400.00

Public - Federal

Site Work

65

4

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
20
Active Projects
10
Bidding Soon
204
All Active Projects
78
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 5, 2024

October 7, 2024

img_map_placeholder

To Be Determined, Pembina, ND

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.